My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />.1- <br />On -Call Engineering Services <br />surrounding the museum including Upper and Lower Grand Avenues (Upper <br />Grand Is bridged directly over Lower Grand) and an extension of the bridge deck <br />from Upper Grand over GTK Way to form a new plaza between Broad and an <br />adjacent high-rise condominium. Coordination of numerous existing and <br />proposed structural elements and phasing were critical to the completion of <br />these construction documents. Plan's standards, details, specification and <br />design criterlawere in accordance with public works standards and to the <br />satisfaction ofcity plan checkers. <br />City of West Hollywood Library and Garage, West Hollywood, CA -CAD <br />Designer, 2008 <br />Nick was responsible for generating and coordinating on-site construction <br />documents and off-site street Improvement plans for this existing library's <br />frontage and a new below -ground parking structure which has a green roof that <br />expands and adjacent park footprint. Nick prepared a storm drain connection <br />plan for an onsite storm water treatment system, B-pennit plan and profiles <br />Improving all of San Vicente Blvd and alley surrounding building, reconstruction <br />of alley driveway and pedestrian ramps. Plan's.standards, details, specification <br />and design criteria were in accordance with public works standards and to the <br />satlsfaction of city plan checkers. <br />Santa Monica Street Scapa, Third Street promenade, Santa Monica, CA- CACI <br />Designer, 2008 <br />Nick was responsible for generating off-site street scape plans for 2id Street, Q"' <br />Street and 5�' Street between Wilshire Blvd and Colorado Ave. Nick prepared <br />control pians for an A -permit that relocated tree wells, benches, trash can, light <br />poles, and closed driveways. Plan's standards, details, specification and design <br />criteria were in accordance with public works standards and to the satisfaction <br />of city plan checkers. <br />Emerson College Los Angeles Center, Los Angeles, CA - CAD Designer, 2010 <br />Nick was responsible for generating and coordinating on-site construction <br />documents and off-site street improvement plans for this private college's all <br />new 107,000 SF state-of-the-art facility. Nick prepared B -permit pians Improving <br />ail of Sunset Blvd and Gordon St along the north and west sides of the site, <br />adding ramps and relocating driveways. Plan's standards, details, specification <br />and design criteria were in accordance with public works standards and to the <br />satisfaction of city plan checkers. <br />(l TAIT Appendix I Page 16 <br />25E-595 <br />
The URL can be used to link to this page
Your browser does not support the video tag.