|
ON -GALL ENGimrERINGSERVICES
<br />RFP NO.: 17-083
<br />City of Santa Ana
<br />Emphasis
<br />• Streat Wdentooserld Improvements
<br />• Now Pavements and Pavement Rehabilitation
<br />• Pedestrian Crossings
<br />• 8*6 Pallut
<br />• Project Management
<br />Professional Overview
<br />Mr. Nlranjonan Is a registered gootechnical engineer with
<br />PROPOSAL
<br />=10
<br />.Asalanw-
<br />A q... "
<br />11'"J�tedrM.W4
<br />200DIMaster of Civil ftlinoodniMvil
<br />ftineoring/Washington Slate UnIvarsity
<br />190710achelor of Solanco/ClAl
<br />blifnebring/UnIverally of Peradefilya Sri Lanka
<br />Professional fcogiftitration
<br />20D9/GeolechnIcal EnginsedCA12819
<br />20041ftfesslonal Enginear/CM7029
<br />Memberships
<br />American Society of Civil Engineers
<br />over 17 years of goo"nical engineering project
<br />experience, Including pavement evaluation and rehabilitation, street widenlogs6 bike paths, highway
<br />Improvements, sound waft and retaining walls, buildings. bridges,
<br />- grade soparationi and other
<br />Infrastructure projects. He has 000rdlrmtsd, performed, or directed gootoolimloal Investigations for over 200
<br />projectei many of Which have been for Cities In Orange and Los Angeles Counties, as well as Riverside and San
<br />Bernardino Counties. He has practical experience In all aspects (design and constroftn) of geotechnical
<br />anglin saying, Including site selection, field Investiiallons,.engilneering analyses, recommendations, conobuctlon
<br />observation and testing, and preparation of geotechnical reports and recommendations,
<br />Professional Experience
<br />OCTA OC Strootear Project Santa Ana, CA- Gootochnical manager for the design and construction of a two -
<br />track sk"toor system from the Santa Ana Regional Transportation Center In Santa Ana to the proposed Regional
<br />Transit Connection and station In Garden Grove, approximately 4 miles long. The project Includes design and
<br />coristruetton of a 2 -story maintenance and storage facility building and two now bridge structures (Santa Ana
<br />Bridge and Westminster Avenue undarorossing). The maintenance and storage facility Is planned to house all light
<br />revenue maintenance functions. Including opere.flons. This Will accommodate administration, operations,
<br />nalatenance, repair her-, and parts storaro. A maIntananqe- building, a wash bulklIng, parking lots, and -- fire lane
<br />are proposed for this facility. Responsible for reviewing existing gootachnicallgeological data, coordinating
<br />pormilling process for geotechnical encroachment permits from various agencies such as OCTA, City of Santa
<br />Ana, and County of Orange, coordinating subsurface explorations, assigning laboratory testing performed
<br />onginoeritto analyses, attending design meetings, and preparing gootechnicaf reports with gooteolmical
<br />recommendations In accordance with Caltrans guidelines.
<br />JamboroolBarranca Interchange Improvement, frAno, CA - Geotqrhnical project engineer for Improvements to
<br />the Jamboree/Darrance Intersection In Irvine, The Improvements Include the addition of a fifth northbound lane on
<br />Jamboree Road, approximately 1,000 feet long; addition of a right -turn pocket from northbound Jamboree Road
<br />Into the Griswold property, construction of new pavement curb and gutter, sidewalk, and access ramps; and
<br />relocation of a atom drain. DYA!s services Included securing encroachment permits, conducting a geotechnical
<br />subsurface exploration, performing laboratory tests on selected soil samples, performing engineering analyses to
<br />develop conclusions and recommendations regarding subsurface conditions, site preparation and grading,
<br />bedding and beoldill, pavement thickness for now pavements, and soil corrosion potonfial; and preparing a
<br />gootochnical report. Mr. N"anan coordinated the field Investigation and conducted analyses.
<br />Bristol Street and Baker Street Intersection Improvements, Costa Mesa, CA - Gootechnical manager for the
<br />addition of a third cauftund and westbound through lane on Baker Street approximately 200 feet long in both
<br />directions west of the Intersection of Bristol Street and Baker Street. DYA performed a subsurface Investigation,
<br />laboratory testing, engineering analyses, and a geotechnical report with rocommandations for earthwork and
<br />grading, corrosion potential and new flexible and rigid pavement sections, Mr. Nlrenjanan developed and
<br />coordinated the field Investigation and analyses and prepared the geotechnicall. report With recommendations.
<br />KA -;g tp 'a .' , .
<br />25E-651
<br />f
<br />
|