Laserfiche WebLink
ON -GALL ENGimrERINGSERVICES <br />RFP NO.: 17-083 <br />City of Santa Ana <br />Emphasis <br />• Streat Wdentooserld Improvements <br />• Now Pavements and Pavement Rehabilitation <br />• Pedestrian Crossings <br />• 8*6 Pallut <br />• Project Management <br />Professional Overview <br />Mr. Nlranjonan Is a registered gootechnical engineer with <br />PROPOSAL <br />=10 <br />.Asalanw- <br />A q... " <br />11'"J�tedrM.W4 <br />200DIMaster of Civil ftlinoodniMvil <br />ftineoring/Washington Slate UnIvarsity <br />190710achelor of Solanco/ClAl <br />blifnebring/UnIverally of Peradefilya Sri Lanka <br />Professional fcogiftitration <br />20D9/GeolechnIcal EnginsedCA12819 <br />20041ftfesslonal Enginear/CM7029 <br />Memberships <br />American Society of Civil Engineers <br />over 17 years of goo"nical engineering project <br />experience, Including pavement evaluation and rehabilitation, street widenlogs6 bike paths, highway <br />Improvements, sound waft and retaining walls, buildings. bridges, <br />- grade soparationi and other <br />Infrastructure projects. He has 000rdlrmtsd, performed, or directed gootoolimloal Investigations for over 200 <br />projectei many of Which have been for Cities In Orange and Los Angeles Counties, as well as Riverside and San <br />Bernardino Counties. He has practical experience In all aspects (design and constroftn) of geotechnical <br />anglin saying, Including site selection, field Investiiallons,.engilneering analyses, recommendations, conobuctlon <br />observation and testing, and preparation of geotechnical reports and recommendations, <br />Professional Experience <br />OCTA OC Strootear Project Santa Ana, CA- Gootochnical manager for the design and construction of a two - <br />track sk"toor system from the Santa Ana Regional Transportation Center In Santa Ana to the proposed Regional <br />Transit Connection and station In Garden Grove, approximately 4 miles long. The project Includes design and <br />coristruetton of a 2 -story maintenance and storage facility building and two now bridge structures (Santa Ana <br />Bridge and Westminster Avenue undarorossing). The maintenance and storage facility Is planned to house all light <br />revenue maintenance functions. Including opere.flons. This Will accommodate administration, operations, <br />nalatenance, repair her-, and parts storaro. A maIntananqe- building, a wash bulklIng, parking lots, and -- fire lane <br />are proposed for this facility. Responsible for reviewing existing gootachnicallgeological data, coordinating <br />pormilling process for geotechnical encroachment permits from various agencies such as OCTA, City of Santa <br />Ana, and County of Orange, coordinating subsurface explorations, assigning laboratory testing performed <br />onginoeritto analyses, attending design meetings, and preparing gootechnicaf reports with gooteolmical <br />recommendations In accordance with Caltrans guidelines. <br />JamboroolBarranca Interchange Improvement, frAno, CA - Geotqrhnical project engineer for Improvements to <br />the Jamboree/Darrance Intersection In Irvine, The Improvements Include the addition of a fifth northbound lane on <br />Jamboree Road, approximately 1,000 feet long; addition of a right -turn pocket from northbound Jamboree Road <br />Into the Griswold property, construction of new pavement curb and gutter, sidewalk, and access ramps; and <br />relocation of a atom drain. DYA!s services Included securing encroachment permits, conducting a geotechnical <br />subsurface exploration, performing laboratory tests on selected soil samples, performing engineering analyses to <br />develop conclusions and recommendations regarding subsurface conditions, site preparation and grading, <br />bedding and beoldill, pavement thickness for now pavements, and soil corrosion potonfial; and preparing a <br />gootochnical report. Mr. N"anan coordinated the field Investigation and conducted analyses. <br />Bristol Street and Baker Street Intersection Improvements, Costa Mesa, CA - Gootechnical manager for the <br />addition of a third cauftund and westbound through lane on Baker Street approximately 200 feet long in both <br />directions west of the Intersection of Bristol Street and Baker Street. DYA performed a subsurface Investigation, <br />laboratory testing, engineering analyses, and a geotechnical report with rocommandations for earthwork and <br />grading, corrosion potential and new flexible and rigid pavement sections, Mr. Nlrenjanan developed and <br />coordinated the field Investigation and analyses and prepared the geotechnicall. report With recommendations. <br />KA -;g tp 'a .' , . <br />25E-651 <br />f <br />