|
City of Santo Ana
<br />s,
<br />Michael Bustos, PE, ENV, SP
<br />' Water and Sewer Engineer Construction Manager
<br />Profile Summary
<br />Education: BS, Civil Engineering (Magna cum Lauds), California Polytechnic State University, San Luis
<br />r, Obispo
<br />Coltrane Resldent Engineer Academy
<br />Registration. Civil Engineer, California No. 73179
<br />sl Envision Sustainability Professional, Institute for Sustainable Infrastructure
<br />Affiliations: City Traffic Engineers
<br />American Public Works Association
<br />Institute of Transportation Engineers
<br />Experience. 16 Years
<br />Mr. Michael D. Bustos is responsible for design and construction management of projects such as road.
<br />way reconstructions, drainage improvements, pipelines, pavement rehabilitation, street Improvements, and
<br />1 grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded projects
<br />a over the last five years. He has gained valuable experience in on-site construction management, offsifs
<br />construction administration, Inspection, design, and plan checking during his 13 years with Wilidan.
<br />t Relevant Project Experience
<br />Trunk Water Replacement, Morongo Band of Mission Indians, Banning, California. Project Engi-
<br />neer/Construction Manager. Engineer of Record responsible for preparation of plans, specifications, and
<br />estimate for construction of 16•Inch water main on Porters, Morongo, and Martin Roads, Mr. Bustos also
<br />served as Construction Manager during constmollon, and was responsible for contract administration, mate -
<br />dais testing, and public works observation.
<br />Pirestone/Atlanilo Design, City of South Gets, California. Reclaimed Water Design Engineer. Mr.
<br />Bustos provided construction phase design support for installation of a 10 -inch reclaimed water line on Fire-
<br />stone Blvd. The project was constructed by the city and maintained by Central Basin Municipal Water Dis-
<br />trict Willdan provided surveying, civil engineering, geotechnical engineering, and utility coordination ser-
<br />vices for street Improvements on Firestone Boulevard from Dorothy Avenue to Latta Avenue and on Atlantic
<br />Avenue from Palate Street to Branyon Avenue. As part of our design services, Wilidan provided final civil
<br />plans, Including street design, storm drain, sewer and water relocation, traffic signal modification and Instal -
<br />lotion, signing and striping, street lighting, contract specifications, and engineer's estimate for widening both
<br />Firestone Boulevard and Atlantic Avenue. In addition, Wilidan prepared a project report and cost estimates,
<br />including aerial topography and street centerlines; roadway geometries; hydrology study; sewer study; water
<br />study; utility relocation concepts; geotechnical recommendations; turn pocket lengths; landscaping.
<br />Rehabilitation of Well No. 25, City of South Gate, California. Project Engineer. Mr. Bustos assisted while
<br />managing the hydrogoologieal sub-oonsultant: Hopkins•Groundwater Consultants, Inc. (Hopkins) In provid-
<br />I Ing well rehabilitation consultation services to the City. The wall had been out of service for three years due
<br />to a sanding problem. When in operation, produotion from the lower half of the 1,300 feet deep well was
<br />providing only 20 percent of the overall well production. Folllowing initial consultation, Mr. Bustos and Hop-
<br />kina prepared a well condition assessment to allow the City to explore their rehabilitation options, than se-
<br />lect a method that would possibly allow the City to regain production from -the perforated zones of the exist-
<br />ing casing. Mr. Bustos facilitated well condition assessment and inspection services during well cleaning
<br />and video survey (aided by Hopkins). The completed well review provided the City with an accurate as-
<br />sessment of the well's current conditions and recommendations for rehabilitation. Following the well condi-
<br />tions review, and at the request of the City, Mr. Bustos and Hopkins prepared specifications for the City's
<br />preferred rehabilitation method.
<br />Comprehensive. Innovative. Trusted.
<br />25E-679
<br />Proposal for On•GsllEniineering 17
<br />RFP No. 17-M
<br />
|