Laserfiche WebLink
City 4f Santa Ana <br />Pr%cf note <br />■ Civil Drafter/Designer <br />! <br />Crsdendele Profile <br />■ Autodesk AutoCAD Certified Profes- ■ 17 Years" Experience <br />sional <br />■ Autodask AutoCAD Civil 3D Certified <br />Assoolat <br />FJackground Summery <br />Mr, Randy. Shadowen is responsible for preparation of Micro Station and AutoCAD drawings, both for geometric <br />pians and final construction lid <br />documents for a variety of local street, highway and railroad projects and flood con- <br />trol lorolects and for Drolects on <br />the state freeway and highway system that are subject to rev ew by CalLmIM, <br />Flay Wellington, PE <br />Credentials Profile <br />Pro/eot mole <br />■ Civil Engineer, California, No. 25131 ■ Technical and Managerial Semi - <br />Water and Sewer Engineer <br />■ Traffic Engineer, California No. 958 nars and Workshops <br />■ BS, Civil Engineering, California State ■ Resident Engineer Academy (UC - <br />Polytechnic University, Pomona) <br />Graduate Courses, Public Administra- ■ 443 Years° Experience <br />.I -- <br />Mr. Hay Wellington has performed numerous Infrastructure planning, funding, design and construction improve - <br />i mentprojects with specific experience in arterial roadways, local streets, and highways includes Initial project plan - <br />Ong, scoping, design oversight, right-of-way engineering, plan and specification reviews, bidding process, and oon- <br />striation management and Inspection. <br />ften Moore PE Credendels Proftla <br />Project Role ■ Civil Engineer, Cali omia No. 82724 ■ BS, Gild Engineering <br />Drainage Engineer M9 Envirmmental En Ueerin ■ 8 Years' Experisnoo <br />i Background Summary <br />t Mr. Ryan Moore is responsible for designing street, drainage, regional SMP, and sewer profects. This includes <br />preparation of hydrology and hydraulic reports, plans, specifications, and estimata for storm drain, sanitary sewer, <br />Project Role ■ 25 Years' Experionce <br />• H_ ydroloraalic Analyst <br />Baokg ound Summary <br />Mr. Kenneth Kdoger specializes in developing and executing hydraulic modeling software for flood control, storm <br />drain and sower related projects. He has performed hydrology and hydraulic calculations on numerous flood con- <br />rarojecrtfore lo Landscape Architect, CA No. 17 Years' Experience <br />■ Plantinq/Irrigation Architect 1 4987 <br />Mr. Bryan Nguyen Is experienced with developing conceptual landscape pians with extensive graphic vignettes <br />such as photographic before and after simulations; and the preparation of construction documents, Mr. Nguyen is <br />proficient In prepan7tg Irrigation water and landscape management specification documents and performing agency <br />contract landscape plan reviews. <br />Christopher KelieY, PE. QSD/P Credentials Profile <br />Project mole ■ Civil Engineer, California No. ■ 10 Years' Experience <br />■ Water Quality Engineer 83179 <br />■ QSD/P, CA Stormwater Quality <br />Assooiation No, 25874-, <br />i Background Summery <br />Mr. Christopher Kelley is responsible for design and review of public works Improvement projects, including streets, <br />highways, storm drains, and water quality Improvements. He designs and reviews low -impact development reports <br />and best management practices under numerous M84 permits to comply with the National Pollutant Discharge <br />Elimination System MS4 Permit. <br />" <br />mprahensiva. innovaProposal foron-call En sarin 19 <br />� Cotiva.'nvstad. � �' <br />kFP No. 17-D88 r <br />25E-681 <br />