Laserfiche WebLink
City of Santa Ana <br />Understanding of Need <br />The City of Santa Ana's Public Works Agency Is seeking experienced professional consultants to retain on as - <br />needed or on-call basis for various general engineering design and related supporting services involving public <br />facilities and Infrastructure needs. Additionally, the CIVs RFP contains two'tasW to be addressed by selecting <br />" either Option A, Option B or both A and B by providing representational scopes of work, schedule and fee. Be- <br />low is our outline that demonstrates the understanding of the work to be provided, <br />Scope of Work <br />Per the RFP, the following Is a representation of how Willdan defines the scope for Water Resources projects <br />(Option A) and General Engineering design otherthan Water Resources (Option B). For Tasks that ars largely <br />similar, such as Project Management, the scope has been combined for Option A and B as noted in following <br />Task headers. <br />Task 'I — Project Management — Option A and Option 8 <br />Willdan understands effective project management Is a ne- ® Task 1 Deliverables <br />mostly to maintain project control. Because of this, Willdan <br />approaches each project with a Project Management Plan ' matrix, meetinschedug <br />agendas <br />attendance, rosters, <br />(PMP). The PMP Identifies the project team, stakeholders, . matrix, meeting schedul and minutes <br />scope, potential project challenges, and establishes a QA(QC x MonthlDetaily project schedule <br />j plan, project tasks, deliverables and milestones. The PMP Monthly project reports <br />establishes regular meetings with City staff, utility companies and other participating agencies, as required, to <br />discuss work progress, schedule, and related Issues to exchange Information, discuss and resolve issues, and to <br />maintain progress of the project. The PMP Is the overarching resource that ensures effective communication <br />and complete project control. In addition, Wflidan will dedicate a Project Manager to manage the performance of <br />the project Including, but not limited to, facilitating coordination between the design team, the City of Santa Ana, <br />+ utility companies, and other stakeholders directly affected by the proposed project. The Project Manager will su- <br />pervise, coordinate, monitor and review the project design for confonnance with City standards, policies, and pro- <br />cedures and will be responsible for. <br />Maintaining continuous communication with City Project Manager, Including meetings to review the prelimi- <br />nary design and project status at 30-, 60•, and 100-parcent completion. <br />Providing monthly project status report, or as specified In the PMP. <br />Overseeing project delivery targeting proposed schedule and minimising project budget. <br />Willdan will facilitate a pre -design meeting with City representatives to review the project In detail. Willdan will <br />determine requirements and procedures for design, ongoing review, and coordination. In consultation with City <br />representatives, Willdan will determine relevant issues specific to the project, design standards, and funding rim - <br />Its. Progress meetings will be held monthly or more frequently If needed, with City staff, permitting agencies and <br />utility companies as needed. <br />Task 2 — Agency and Utility Coordination — Option A and Option O <br />Subtask2.01 Conditions Review. Option A., Wildan will review available well data to be provided by the <br />City of South Gate, including well completion and testing reports, well geophysical loge, well Inspection videos, <br />t hydraulic efficiency tests, water quality tests, and other pertinent information. Willdan will use the Information pro- <br />vided by the City to prepare an assessment summary letter including discussion of the rieks and benefits assoot- <br />ated with alternative rehabilitation procedures. The summary letter will also identify If any additional testing is re- <br />quired prior to, or during well rehabilitation to fill data gaps or provide essential Information. <br />! SubtaskZ02—� enc and Utility Coordination. OptionAAND <br />N Task 2.02 Deliverables <br />Option 8: Wilidan will request utility atlases from utility companies . Well Assessment Summary Letter <br />known to operate and/or maintain facilities within the project areas for . Meeting agendas and minutes <br />reference in the Improvement plans. Wilidan will conduct a utility inves- • Utility notification letters <br />ligation to Identify utilities that will be Impacted and will research prior • Utility matrix <br />rights to clearly Identify parties responsible for relocation of the affected <br />utilities• Willdan will coordinate the utility improvements with the identified utility companies, Including the Impacts <br />to high•hazardlhigh-pressure facilities, <br />Per the City's Request for Proposal, coordination with utility companies will inoludo: <br />i 1 Prepare Initial request for utility information such as atlas sheets, mapping, or as -built plans and develop util- <br />ity base map based upon information received from utility companies. <br />Ir <br />CProposal for OmCatt nngirreeting <br />! ornprenensive. Innovative, Trusted. <br />RFP No. V-083 <br />.—I <br />25E-683 <br />21 <br />