My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qtv of Santa Ana <br />Project Team> <br />Project Manager <br />Mr. Tyrone Peter, PE will serve as Project Manager and be responsible for delivery of services in accord- <br />ance with the established scope of services for projects awarded under this on-call contract. Mr. Peter pos- <br />sesses a strong work ethic and leadership skills that enable, him to provide clear priorities and direction kr <br />project delivery. Using his ability to assess his staff's strengths, Mr. Peter positions his team members <br />where they can be most successful. He uses his collaborative nature to build and maintain consensus <br />among a variety of stakeholders to the benefit of project delivery. During his career, Mr. Peter has served as <br />Project Manager, Civil Englneering Task Leader, Supervising Engineer, Senior Engineer, Design Engineer, <br />and Designer for over 200 street Improvement projects with design contracts ranging from $5,000 to $2.9 <br />million. <br />Mr. Peter develops trusting partnerships with project stakeholders through open and honest communication. <br />t <br />He will work closely and collaboratively with the City's project representatives to determine optimal use of <br />Willdan's project team. While a highly cost-effecNe team has been assembled for this project, Mr. Peter will <br />continuously look for ways to improve efficiency and effectiveness. <br />Subconsultant Team <br />a <br />Wllidan's vast staffing resources enable us to provide services with a minimum of subconsultant assistance. <br />a <br />For this on-oali contract, our In-house team Will be augmented with one subconsultant— AeroTach Surveys, <br />Inc. for field and aerial surveys and electrical engineering, Wiltdan ensures all subconsultants provide the <br />same caliber of performance that Wllldan provides by holding our subconsuitants accountable to Wilidan's <br />, <br />high standards of performance, scheduling, and budgetary controls. For federaldstate funded projects, Will- <br />dan has a database of disadvantaged business enterprises that we will utilize to cull select specialty disci- <br />, <br />plines In support of the City's stated project DBE goal. <br />t, <br />— ftWTec"urveys7 lnc— — — <br />Schmidt Geomatic Mapping, Inc., doing business as AeMTeoh Surveys, is a Csilfomia corporation founded r 7 <br />41 years ago. It Is a state•eertilled woman -owned small business enterprise. The firm provides aerial map- <br />ping services supported with land surveying services, Under the direction of a Caltfomia-licensed land sur- <br />veyor, the staff at AsroTech provides comprehensive services to meet client mapping needs, They plan the <br />aerial control layouts, flight coverage, Imagery acquisition, photogrammetdo mapping, and CAD editing. <br />AeroTech's survey crews set and survey the aerial control network and provide sits-speoltio surveys. Project <br />capabilities include monument recovery, monument preservation, baseline control networks, benchmark el- <br />evation surveys, alignment surveys, cross sections, deformation surveys, and more. <br />Comprehensive. Innovative, Trusted. <br />25E-718 <br />J <br />MSS <br />Proposal for On -Cell Engineering, <br />RFP No. V-089 <br />
The URL can be used to link to this page
Your browser does not support the video tag.