Laserfiche WebLink
City of Santa Ana <br />Project Organization <br />The organization chart presented below Identities our key personnel and Illustrates the communication and <br />reporting relationships and project rotes for Wllldan"s key team. This chart Illustrates current Willdan employ. <br />es and represents the depth of technical support personnel that may be utilized for an on-call project <br />award. This Is far from an exhaustive list of our staff resources. W10dan understands that key staff cannot be <br />replaced without consent of the City. Our organization chart Includes our two auboonsuitants and depicts <br />their tine of reporting and communication. <br />Resumes for Key staff have been Included on the following page. <br />David Knell, PLS <br />Susan Banientos <br />Design Survey <br />Aero Tech Surveys, Inc. <br />City of <br />Santa ,Ana <br />Tyrone Peter, PE <br />Johnny Ghazal, PB <br />Chris Stone <br />Abner Catig <br />Alaxis Escobar, EIT <br />Bernardo Reyes <br />RandyShadowen <br />Drainage Systems Design <br />Ryan Moore, PE <br />Kenneth Krieger <br />NPDES Permitting <br />hristopher Kathy, PE, QWJ <br />UtilltyCoordination <br />Edward Cox <br />Sheila McCracken <br />Comprehensive. Innovative, Trusted. <br />Dave Hatt, PE <br />tl.A SahrddtrLopaxJr.- <br />RA Robert Sun <br />25E-719 <br />PMYSP jVhm*$aMuftQZ'p4A!Rotrci <br />Keyln Custedo; ECT <br />NlcolleSpann, EIT <br />Proposal for On -Call Engineering,. 7 <br />RFP No. 9.7-083 <br />