|
necessary reports, pians, specifications, and estimates documentation, Performance of these responsibili-
<br />r
<br />City of Santa Ana
<br />L..
<br />Tyrone Peter, PE
<br />Project Manager
<br />Proffle Summary
<br />u.J
<br />Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering
<br />Civil Engineering, Murugappe Polytechnic
<br />.
<br />Registration: Civil Engineer, California No. 81888
<br />Affiliations, American Public Works Association
<br />American Society of CiWI Engineers
<br />Experience: 11 Years
<br />L
<br />Mr. Tyrone Peter is an accomplished civil engineer for multi -discipline and mull-agermy Infrastructure pro -
<br />)sots and Is known for providing innovative, quality engineering services to ensure project delivery within
<br />• 1
<br />budget and schedule. As the project manager for the City's On Cali Engineering Services project, with quali-
<br />k-0
<br />fied staff and resources, he will be responsible for successful project delivery.
<br />Mr. Peter's 11 plus years of experience managing and designing all types of public works projects provide a
<br />t
<br />solid foundation to understand what is needed to deliver a successful project and make him the perfect fit
<br />`
<br />for overseeing the entire project as well as specific civil engineering tasks His comprehensive experience
<br />includes design of state highway, new street, street widening, street realignment,avement rehabilitation,
<br />�
<br />light rail and railroad, grade separation, flood control facility, water, and sewer protects. Mr. Peter has super-
<br />wised feasibility study, project study report, project report, construction document preparation as well as
<br />.
<br />grade certification issuance, construction administration, and construction inspection.
<br />,�
<br />Relevant Project Experience
<br />IF
<br />Emerald Say Matn Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Calffor-
<br />`'
<br />necessary reports, pians, specifications, and estimates documentation, Performance of these responsibili-
<br />ties required expertise and knowledge in street, traffic, drainage, structural, and pavement design, ADA
<br />standards, public outreach, pedestrian safety, and water quality. Wilidan provided civil and traffic engineer -
<br />Ing design and other appurtenarrt services for safety improvements at the main gate entrance. improve-
<br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accommodate the
<br />u.J
<br />i roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and ramps, and re-
<br />taining and monument walls; widening the right -turn pocket and installing a median; and installing street
<br />r h
<br />striping and signage within Caltrans' right-of-way.
<br />Firestone Boulevard Capacity Enhancement, City of South Cate, California. Project Manager responsi-
<br />ble for overall project management and oversight required for the corridor improvements from Alameda
<br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge In street
<br />L
<br />and pavement design, ADA standards, public outreach, environmental documentation, Green Street design,
<br />and watershed management planning. The improvements Involved increasing traffic capacity by reconfigur-
<br />• 1
<br />Ing the roadway from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median
<br />k-0
<br />lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-oompliant ramps; parkway
<br />trees; artistic elements, corridor entrance monument; bus shelter and bus turnouts; and traffro signal modifi-
<br />cations. Services provided included civil, traffic, pavement, and drainage engineering; landscape arohitec-
<br />`
<br />tura, survey and right-of-way engineering; and utility relocation.
<br />Orange Line Extension, Brutoco Engineering & Construction, lncJLos Angeles County Metropolitan
<br />�
<br />Transportation Authority, Loa Angeles, California. Civil Engineering Task Leader responsible for provid-
<br />ing and overseeing all civil improvement design required for the design/build of the MOL extension from the
<br />Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Performance of
<br />,�
<br />these responsibilities required expertise and knowledge in Intersection design, bike lanes, ADA standards,
<br />street geometric design, light-rail standards, parking lot and roadside safety design, Wllldan prepared pians,
<br />specifloations, and estimate for street widening, raised landscaped medians, irrigation system, ADA access
<br />curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communica-
<br />tion conduits, and signing and striping. Three stations were constructed or reconstructed.
<br />Proposal for On -Call Engineering
<br />Comprehensive. Innovative. Trusted. r IP No. 17.093
<br />"
<br />k,J -
<br />25E-720
<br />
|