Laserfiche WebLink
necessary reports, pians, specifications, and estimates documentation, Performance of these responsibili- <br />r <br />City of Santa Ana <br />L.. <br />Tyrone Peter, PE <br />Project Manager <br />Proffle Summary <br />u.J <br />Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering <br />Civil Engineering, Murugappe Polytechnic <br />. <br />Registration: Civil Engineer, California No. 81888 <br />Affiliations, American Public Works Association <br />American Society of CiWI Engineers <br />Experience: 11 Years <br />L <br />Mr. Tyrone Peter is an accomplished civil engineer for multi -discipline and mull-agermy Infrastructure pro - <br />)sots and Is known for providing innovative, quality engineering services to ensure project delivery within <br />• 1 <br />budget and schedule. As the project manager for the City's On Cali Engineering Services project, with quali- <br />k-0 <br />fied staff and resources, he will be responsible for successful project delivery. <br />Mr. Peter's 11 plus years of experience managing and designing all types of public works projects provide a <br />t <br />solid foundation to understand what is needed to deliver a successful project and make him the perfect fit <br />` <br />for overseeing the entire project as well as specific civil engineering tasks His comprehensive experience <br />includes design of state highway, new street, street widening, street realignment,avement rehabilitation, <br />� <br />light rail and railroad, grade separation, flood control facility, water, and sewer protects. Mr. Peter has super- <br />wised feasibility study, project study report, project report, construction document preparation as well as <br />. <br />grade certification issuance, construction administration, and construction inspection. <br />,� <br />Relevant Project Experience <br />IF <br />Emerald Say Matn Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Calffor- <br />`' <br />necessary reports, pians, specifications, and estimates documentation, Performance of these responsibili- <br />ties required expertise and knowledge in street, traffic, drainage, structural, and pavement design, ADA <br />standards, public outreach, pedestrian safety, and water quality. Wilidan provided civil and traffic engineer - <br />Ing design and other appurtenarrt services for safety improvements at the main gate entrance. improve- <br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accommodate the <br />u.J <br />i roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and ramps, and re- <br />taining and monument walls; widening the right -turn pocket and installing a median; and installing street <br />r h <br />striping and signage within Caltrans' right-of-way. <br />Firestone Boulevard Capacity Enhancement, City of South Cate, California. Project Manager responsi- <br />ble for overall project management and oversight required for the corridor improvements from Alameda <br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge In street <br />L <br />and pavement design, ADA standards, public outreach, environmental documentation, Green Street design, <br />and watershed management planning. The improvements Involved increasing traffic capacity by reconfigur- <br />• 1 <br />Ing the roadway from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median <br />k-0 <br />lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-oompliant ramps; parkway <br />trees; artistic elements, corridor entrance monument; bus shelter and bus turnouts; and traffro signal modifi- <br />cations. Services provided included civil, traffic, pavement, and drainage engineering; landscape arohitec- <br />` <br />tura, survey and right-of-way engineering; and utility relocation. <br />Orange Line Extension, Brutoco Engineering & Construction, lncJLos Angeles County Metropolitan <br />� <br />Transportation Authority, Loa Angeles, California. Civil Engineering Task Leader responsible for provid- <br />ing and overseeing all civil improvement design required for the design/build of the MOL extension from the <br />Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Performance of <br />,� <br />these responsibilities required expertise and knowledge in Intersection design, bike lanes, ADA standards, <br />street geometric design, light-rail standards, parking lot and roadside safety design, Wllldan prepared pians, <br />specifloations, and estimate for street widening, raised landscaped medians, irrigation system, ADA access <br />curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communica- <br />tion conduits, and signing and striping. Three stations were constructed or reconstructed. <br />Proposal for On -Call Engineering <br />Comprehensive. Innovative. Trusted. r IP No. 17.093 <br />" <br />k,J - <br />25E-720 <br />