Laserfiche WebLink
Cit of Sante Ann <br />Los Alamitos Boulevard Median improvements, City of Los Alamitos, California. Project Manager ro, <br />sponsible for overall project management and oversight required for the improvements between Cerritos <br />i I Avenue and Kateila Avenue. Performance of these responsibilities required expertise and knowledge in <br />street improvement, pavement rehabilitation, public outreach, signing and striping, street lights, and planting <br />i and irrigation. Improvements Involved raised median, pavement delineation, landscape and Irrigation Im- <br />provements, street lighting and traffic signal Improvements at Intersections with <br />Florists Street and Sausalito Street. There was minor traffic signal modification at Intersections with Katella <br />Avenue and Cerritos Avenue. <br />Placentia Metrolink Station Phase I and 11, Orange County Transportation Authority, Orange County, <br />California. Project Manager responsible for providing and overseeing all civil Improvement design required <br />for infrastructure Improvements for the new station. The project site Involved approximately 4.75 acres to <br />provide a Metrolink commuter rail station that meets current and future transit demand and ADA require. <br />ments. The project goal fostered train ridership growth In the region. The station was planned as part of a <br />key component of transit orlented development envisioned In the Westgate Specific Plan for the City of Pia- <br />contra. The project improvements Included street, railroad track, and pedestrian Improvements; rail plat- <br />forms; and lighting, signing and striping of four parking facilities for 425 vehicles. <br />,•i <br />I <br />Downs Street Widening, City of Ridgecrest, California. Civil Engineering Task Leader responsible for <br />providing and overseeing all civil improvement design required for the widening improvements, Perfor- <br />mance of these responsibilities required expertise and knowledge in alternative pavement design, bene- <br />fiVoost analysis, right-of-way engineering, street design, and utility coordination. The project includes <br />envi-ronmental oompliance, right-of-way research, and design. The project limits are Upjohn Avenue and Ridge. <br />crest Boulevard. Improvements Include street widening and new curb, gutter, curb ramps, and sidewalks. <br />The preliminary engineering services include utility research, right-of-way research, field investigations, solis <br />testing, and ground survey. <br />Street Improvements Phase 11, City of Los Alamitos, California. project Manager responsible for overall <br />project management and oversight required for resurfacing of the following projects In the Phase II city-wide <br />program: <br />• Via EI Mercado Street Improvements <br />■ Old Town West Improvements (Chestnut Street, Walnut Street, Florists Street) <br />• Commercial Street Improvements (Cerritos Avenue, Ball Road, Reagan Street, Humboldt Street, Portal <br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Circle) <br />Performance of these responsibilities required expertise and knowledge In pavement rehabilitation strate- <br />gies, ARA standards, and signing and striping. Wilidan conducted alto reconnaissance to observe the pave- <br />ment condition, conducted coring, testing and engineering analysis and summarized the findings In a ge- <br />otechnical report. Per the recommendation, the City streets within the project limits were ground and resur- <br />faced with 2 -Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre- <br />gate baso or with joint plain cement concrete, All manhole, water valve, anode, and monitoring wall covers <br />within the project limits were adjusted to grade. Curbs and driveways were protected in place. Sidewalks <br />were Improved and ramps were Improved to current ADA requirements. <br />WEComprehensive. Innovative. Trusted. <br />25E-721 <br />Proposal for On -Call Gnglnoortng, <br />RFP No, 17.083 <br />