<br />Los Alamitos Boulevard Median improvements, City of Los Alamitos, California. Project Manager ro,
<br />sponsible for overall project management and oversight required for the improvements between Cerritos
<br />i I Avenue and Kateila Avenue. Performance of these responsibilities required expertise and knowledge in
<br />street improvement, pavement rehabilitation, public outreach, signing and striping, street lights, and planting
<br />i and irrigation. Improvements Involved raised median, pavement delineation, landscape and Irrigation Im-
<br />provements, street lighting and traffic signal Improvements at Intersections with
<br />Florists Street and Sausalito Street. There was minor traffic signal modification at Intersections with Katella
<br />Avenue and Cerritos Avenue.
<br />Placentia Metrolink Station Phase I and 11, Orange County Transportation Authority, Orange County,
<br />California. Project Manager responsible for providing and overseeing all civil Improvement design required
<br />for infrastructure Improvements for the new station. The project site Involved approximately 4.75 acres to
<br />provide a Metrolink commuter rail station that meets current and future transit demand and ADA require.
<br />ments. The project goal fostered train ridership growth In the region. The station was planned as part of a
<br />key component of transit orlented development envisioned In the Westgate Specific Plan for the City of Pia-
<br />contra. The project improvements Included street, railroad track, and pedestrian Improvements; rail plat-
<br />forms; and lighting, signing and striping of four parking facilities for 425 vehicles.
<br />,•i
<br />I
<br />Downs Street Widening, City of Ridgecrest, California. Civil Engineering Task Leader responsible for
<br />providing and overseeing all civil improvement design required for the widening improvements, Perfor-
<br />mance of these responsibilities required expertise and knowledge in alternative pavement design, bene-
<br />fiVoost analysis, right-of-way engineering, street design, and utility coordination. The project includes
<br />envi-ronmental oompliance, right-of-way research, and design. The project limits are Upjohn Avenue and Ridge.
<br />crest Boulevard. Improvements Include street widening and new curb, gutter, curb ramps, and sidewalks.
<br />The preliminary engineering services include utility research, right-of-way research, field investigations, solis
<br />testing, and ground survey.
<br />Street Improvements Phase 11, City of Los Alamitos, California. project Manager responsible for overall
<br />project management and oversight required for resurfacing of the following projects In the Phase II city-wide
<br />program:
<br />• Via EI Mercado Street Improvements
<br />■ Old Town West Improvements (Chestnut Street, Walnut Street, Florists Street)
<br />• Commercial Street Improvements (Cerritos Avenue, Ball Road, Reagan Street, Humboldt Street, Portal
<br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Circle)
<br />Performance of these responsibilities required expertise and knowledge In pavement rehabilitation strate-
<br />gies, ARA standards, and signing and striping. Wilidan conducted alto reconnaissance to observe the pave-
<br />ment condition, conducted coring, testing and engineering analysis and summarized the findings In a ge-
<br />otechnical report. Per the recommendation, the City streets within the project limits were ground and resur-
<br />faced with 2 -Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre-
<br />gate baso or with joint plain cement concrete, All manhole, water valve, anode, and monitoring wall covers
<br />within the project limits were adjusted to grade. Curbs and driveways were protected in place. Sidewalks
<br />were Improved and ramps were Improved to current ADA requirements.