|
City of Sant Ana
<br />David Knell, PLS
<br />Survey and RIght-ofWay Engineering Task Leader
<br />Profile Summary
<br />Education: BS, Cartography, Boston University, Boston
<br />Civil Engineering and Land Surveying Classes, Californla State University, Long Beach.
<br />Registration: Land Surveyor, California No, 6801
<br />Affiliations; California Land Surveyors Association
<br />Southern California Experts & Consultants
<br />Experience: 41 Years
<br />Mr, David Knell has been involved In preparing and checking numerous parcel maps and tract maps, ALTA
<br />p
<br />surveys, records -of -survey, lot line adjustments, parcel map waivers, certificates of compliance, and bound-
<br />ary determination. He is responsible for preparing legal descriptions and sketches for a wide range of ease-
<br />(A
<br />ments Involving utilities, air space reservations, and construction projects. Mr. Knell works with major utilt-
<br />t.,
<br />ties and title companies in determining easements and correcting defective legal desoriptions, His expert -
<br />once includes supervising field crews, overseeing an office staff dealing with various survey projects, and
<br />rn
<br />extensive experience with focal, state, and federal agencies,
<br />Relevant project Experience
<br />Emerald Bey Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Califor-
<br />nia, Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field sur-
<br />vey services and preparing necessary right-of-way engineering documentation. Witidan provided civil and
<br />traffic engineering design and other appurtenant services for safety improvements at the main gate en-
<br />trance, Improvements Involved -road -,widening, guardhouse relocation and reconstruction; grading to accom-
<br />_modata-tha-r-oaduu&Wuktaoing� landscaping;anstaWn"pgmde&llghting, ALBA-catuptiant curios and
<br />ramps, and retaining and monument walls; widening the right -turn pocket and Installing a median; and In-
<br />rj
<br />stalling street striping and signage within Caltrans' right-of-way.
<br />G
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re-
<br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor
<br />r
<br />Improvements from Alameda Street to haunt Avenue. The improvements Involved roadway widening from
<br />e. {
<br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk,
<br />and
<br />curb and gutter, and driveway approach reconstruction; ADA-ecmpliant ramps; parkway trees; artistic, ole-
<br />ments, vorrldor monument; bus shelter and bus turnouts; and traffic signal modifications. Services
<br />b ,i
<br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and
<br />right-of-way engineering; and utility relocation.
<br />Orange Line Extension, Brutoco Engineering & Construction, IncJLos Angeles County Metropolitan
<br />I.
<br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and
<br />overseeing all mapping and right-of-way engineering required for the design/build of the MDL extension
<br />-9?
<br />from the Chatsworth Station to Canoga Station In the Can Fernando Valley along Canoga Avenue. Wfildan
<br />�„
<br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; irrigation sys-
<br />tem, ADA access curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifica-
<br />tions, communication conduits, and signing and striping,
<br />{
<br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader
<br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve-
<br />1-1
<br />menta between Cerritos Avenue and Katella Avenue. improvements Involved raised median, pavement de-
<br />'d
<br />Iineatlon, landscape and irrigation Improvements, street lighting and traffic signal Improvements at Interseo-
<br />tions with Florists Street and Sausalito Street. There was also minor traffic signal modification at lnts rseo�
<br />tions with Katella Avenue and Carritos Avenue,
<br />s
<br />Comprehensive. I nnova'tNe.1histed,
<br />25E-722
<br />6J
<br />Proposal for On-call [ngineering, :T
<br />RPP No. 17-083
<br />Vim/
<br />
|