Laserfiche WebLink
City of Santa Ana <br />Gary Gordon, PE <br />r + Structural Engineering Task Leader <br />Profile Summary <br />Education: SS, Civil Engineering, California State University, Chfoo <br />! Registration: Clvll Engineer, California No. 42176 <br />Affiliations: American Public Works Association <br />American Society of Civil Engineers <br />American Concrete Institute <br />Experience: 52 Years <br />Mr, Gary Gordon has S2 years of comprehensive experience, including project management, design, and <br />construction management of bridge, roadway, traffic signal, waterline, sewer, drainage, and airport projects. <br />In 2015, Mr. Gordon was placed in charge of Wilidan' bddge and structural engineering team. With this now <br />assignment, he now oversees projects such as Mariposa County's rehabflitatlonfreplacament of five bridges <br />that is currently In the prefiminary engineering phase. <br />I Mr. Gordon's career includes serving as a staff member of the Shasta County Department of Public Works, <br />Caltrans Division of Structures, and the City of Redding's Department of Public Worlcs performing detailed <br />and complex design, construction management, and division management and supervision. Throughout his <br />career, Mr. Gordon's focus has been on the delivery of road and bridge projects and the various appurte- <br />nances associated with them. <br />Mr. Gordon has dealt with complex environmental compliance issues involving CEQA and NEPA as well as <br />developed considerable experience with resource agency permitting Issues. The experience and Insight <br />gained from working directly with these agencies have proven invaluable In understanding and appreciating <br />the varying needs of the different types of agencies that W71dan serves and developing the best solutions <br />for those needs. <br />Relevant Project Experience <br />Emerald gay Main Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califon <br />nia. Structural Engineering Task Leader responsible for responding to structural requests for information <br />during construction and redesigning various structural elements to accommodate utility lines discovered <br />during construction. Performance of these responsibilities requires expertise and knowledge In various <br />structural building codes such as ACI, AASHTC, and CBC as well as construction practices and principles. <br />Wiildan provided civil and traffic engineering design and other appurtenant services for safety Improvements <br />at the main gate entrance. Improvements Involved road widening, guardhouse relocation and raconstruc- <br />I tion; grading to accommodate the roadway widening and landscaping; Installing upgraded lighting, ADA - <br />compliant curbs and ramps, retaining and monument walls; widening the right -turn pocket and Installing a <br />median; and installing street striping and slgnage within Caltrans' right-of-way. <br />Lakewood BoulavardtDel Amo Boulevard Not Spot Intersection Improvement, City of Lakewood, <br />California. Structure Engineering Task Leader responsible for overall structural design of culvert structural <br />and retaining walls. Performance of these responsibilities requires expertise and knowledge in various de- <br />sign codes such as ACI and LACFCD for work within a concrete channel under Los Angeles county Flood <br />Control District jurisdiction, The project entailed widening Lakewood Boulevard north of Del Amo Boulevard; <br />modifying/replacing median Islands; widening Del Amo Boulevard; modifying traffic signals; relocating street <br />lights per streettmedian Island modifications; modifying a box culvertichannel wail; and extending a class Ii <br />bike lane. <br />-'- Comprehensive. Innovative, Trusted, <br />- <br />25E-725 <br />Proposal for On -Cali Engineering to <br />RFP No, 27.083 <br />