Laserfiche WebLink
CU ofSentaAnn <br />i . <br />John Hidalgo, RLA <br />Landscape Architecture Task Leader <br />Profile Summary <br />iii <br />Education: BS, Landscape Architecture, California State Polytechnic Unlvsrsily, Pomona <br />L j <br />European Study Tour, California Polytoohnio State University, School of Architecture, Pomona <br />Registration: Landscape Architect, California No. 35511 <br />r•< <br />Licensed Contractor, California C-27 No. 713613 <br />I <br />Affiliations: American Society of Landscape Architects <br />California Parks and Recreation Society <br />California Landscape Contractors Association <br />Experience: 24 Years <br />Mr. John Hidalgo possesses in-depth expertise In landscape architecture design development, preparations <br />of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo is familiar with various <br />local, state, and federal oodes, regulations, procedures, and standards relating to construction, safety, park <br />and facility planning, and other landscape and Irrigation amenities. He has successfully completed projects <br />iii <br />in compliance with these various standards. Mr. Hidalgo has experience representing project owners during <br />L j <br />the plan review process. He possesses comprehensive experience In both field observation and construo- <br />tion. Mr. Hidalgo responsibilities Include managing park and street beautification design, low -impact devel- <br />r•< <br />opments, plan reviews, and construction observation. <br />Relevant Project Experience <br />Firestone Boulevard Capacity Enhancement, City of South hate, California. Landscape Architecture <br />Task Leader responsible for providing and overseeing all landscape and irrigation design required for the <br />—corridor-Imprevernsnts-from Alarneda-StrRet-to-Hunt-Avenue. Rerfaxmance oftAhesesasponsibiiftias-mquited <br />expertise and knowledge In current landscape design Ideas for drought -adaptive landscape and irrigation <br />r' <br />technology. The improvements involved roadway widening from four to six lands; pavement rehabilitation; <br />landscape and hardsoapa medians; median lighting; sidewalk, curb and gutter, and driveway approach re- <br />construction; ADA-oompllant ramps; parkway trees; artistic elements, corridor entrance monument; bus <br />shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, <br />and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility reloca- <br />lion. <br />r g <br />Orange Line Extension, Srutoco Engineering & Construction, lncJLos Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California, Landscape Architecture Task Leader responsible for <br />providing and overseeing all landscape and Irrigation design required for the designtbuild of the MOL exten- <br />sion from the Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Per- <br />formance of these reeponsibilities required expertise and knowledge In working with the City of Los Angeles <br />and the Metropolitan Transportation Authority guidelines and procedures. wilidan prepared plans, speclflea- <br />n <br />tions, and estimate for street widening, ralsed landscaped medians, irrigation system, ADA access our b <br />ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication <br />conduits, and signing and striping, <br />h <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Landscape Architec- <br />ture Task Leader responsible for providing and overseeing all landscape and Irrigation design -- along with <br />Illustrative graphic concept presentations to the City Council •-required for the improvements between Cerrl.- <br />tos Avenue and Katella Avenue, Performance of these responsibilities required expertise and knowledge In <br />graphic design and photographic view simulations of before -and -after scenarios. Improvements Involved <br />raised median, pavement delineation, landscape and Irrigation improvements, street lighting and traffic sig- <br />nal improvements at Intersections with Florists Street and Sausalito Street. <br />k omprehendve. Innovative. Trusted. <br />25E-726 <br />Proposal for On-Callknglneering, <br />r?FP No. 17-083 <br />UI <br />