Laserfiche WebLink
City of5antaAna L.+ <br />Salvador Lopez" <br />Environmental Task Leader L: <br />Profile Summary <br />Education: BS, Urban and Regional Planning, California State Polytechnic University, Pomona <br />Experience: 18 Years <br />Mr. Salvador Lopez has more than 18 years of planning experience that spans all aspects of planning, in- <br />L, <br />cluding current, advance, and environmental planning, as well as active transportation planning and housing <br />l .. <br />and community development He is highly experienced at managing multi -disciplinary teams in the develop- <br />r n <br />ment of policy and long-range planning documents for public agencies, <br />r ' <br />Relevant Project Experience <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Environmental Compli- <br />ance Task leader responsible for providing and overseeing all environmental services required for the corri- <br />dor improvements from Alameda Street to Hunt Avenue. Performance of these responsibilities requires ex- <br />pertise and knowledge In City and County standards, policies, and procedures; general plan practices; and <br />NEPA/050A conformance, The improvements Involved roadway widening from four to six lanes; pavement' <br />4d <br />rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway <br />approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu- <br />ment; bus shaker and bus turnouts; and tragic signal modifications. Services provided Included civil, traffio, <br />l° ° <br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and util- <br />4J <br />try relocation. <br />Garfield Avenue Corridor Improvements, City of Paramount, California. Environmental Compliance <br />Task treader responsible for providing and overseeing all environmental services required for street Im- <br />J <br />modate a third lane in each direction; street resurfacing; two concrete Intersections; concrete sidewalk, curb <br />and gutter, and driveway approach reconstruction; catch basin construction; streetscape Improvements for <br />L, <br />raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic <br />signal modifications at nine locations along the Garfield Avenue corridor. Services Included civil, traffic, and <br />r n <br />drainage engineering; survey and mapping; utility ratocation; landscape architecture; and pavement man- <br />agement. <br />Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood. Environmental <br />Compliance Task Leader responsible for providing and overseeing all environmental services required for <br />complete streat/green street Improvements between the north City limits and Del Amo Boulevard, Perfor- <br />mance of these responsibilities requires expertise and knowledge In City and County standards, policies, <br />and procedures; general plan practices; NEPA/CEQA conformance; complete streets; sustainablilty plan- <br />4d <br />ning; and low -impact development standards. Improvements involved street widening and median Improve- <br />ments; Class 11 bike lanes in both directions; turn lanes; landscape planting and Irrigation; overhead distribu- <br />ton and transmission power undergrounding; sidewalk, curb and gutter, and driveway approach reconstruc- <br />ton; street resurfacing; catch basin construction; storm water quality Improvements to comply with Green <br />4J <br />Streets policy, bike lockers, bus shelter, and traffic signal modifications. Services provided include civil, traf- <br />fic, pavement, drainage, and geotechnical engineering; landscape architecture, survey and right-of-way en- <br />gineering, and utility coordination and relocation. <br />J <br />..J <br />Comprehensive. Innovattvo. Trnsted. <br />25E-728 <br />uv <br />Proposal for On -Call Engineering, I.— <br />RFP NoA7-C83 y , <br />