Laserfiche WebLink
I City ofSanta Ana <br />Understanding of Need <br />The City of Santa Ana's Public Works Agency is seeking experienced professional consultants to retain on as - <br />needed or on-call basis for various general engineering design and related supporting services involving public <br />facilities and infrastructure needs. Additionally, the City's RPP contains two Uaks' to be addressed by selecting <br />either Option A, Option B or both A and B by providing representational scopes of work, schedule and fee. Be- <br />low is our outline that demonstrates the understanding of the work to be provided. <br />Scope of Work <br />Per the RFP, the following Is a representation of how Willdan defines the scope for Water Resources projects <br />(Option A) and General Engineering design otherthan Water Resources (Option B). For Tasks that are largely <br />similar, such as Project Management, the scope has been combined for Option A and B as noted In following <br />Task headers. <br />Task t — Project Management — Option A and Option B <br />Willdan understands effective project management is a ne• <br />cessity to maintain project control. Because of this, Willdan Task t Deliverables <br />approaches each project with a Project Management Plan ' Meeting schedules, as, attendance, minutes <br />(PMP). The PMP Identifies the project team, stakeholders, a matrix, meeting agendas and minutes <br />Detailed project schedule <br />I scope, potential project challenges, and establishes a QA/QC . Monthly project reports <br />plan, project tasks, deliverables, and milestones, The PMP <br />establishes regular meetings with City staff, utility companies and other participating agencies, as required, to <br />discuss work progress, schedule, and related issues to exchange information, discuss and resolve Issues, and to <br />maintain progress of the project. The PMP Is the overarching resource that ensures effective communication <br />and complete project control. In addition, Willdan will dedicate a Project Manager to manage the performance of <br />the project Including, but not limited to, facilitating coordination between the design team, the City of Santa Ana, <br />+ utility companies, and other stakeholders directly affected by the proposed project. The Project Manager will au- <br />! perrise, coordinate, monitor and review the project design for conformance with City standards, policies, and pro- <br />cedures and will be responsible for., <br />Maintaining continuous communication with City Project Manager, including meetings to review the prelimi- <br />nary design and pmjeot status at 30-, 60-, and 100-parcent completion. <br />■ Providing monthly project status report, or as specified in the PMP. <br />Overseeing project delivery targeting proposed schedule and minlmhdng project budgot. <br />Willdan will facilitate a pre -design meeting with City representatives to review the project in detail. Wilidan will <br />determine requirements and procedures for design, ongoing review, and coordination. In consultation with City <br />I representatives, Willdan will determine relevant Issues specific to the project, design standards, and funding Iim- <br />Its. Progress meetings will be hold monthly or more frequently if needed, with City staff, permitting agencies and <br />utility companies as needed. <br />l Task 2 — Agency and Utility Coordination — Option A and Option 8 <br />f Subtask 2.01— Conditions Review, Opilon A; Wllldan will review available well data to be provided by the <br />City of South Gate, Including well completion and testing reports, well geophysical loge, well inspection videos, <br />hydraulic efficiency tests, water quality tests, and other pertinent Information. Willdan will use the Information pro- <br />vided by the Chyto prepare an assessment summary letter Including discussion of the risks and benefits assod- <br />ated with alternative rehabilitation procedures. The summary letter will also identify If any additional testing Is re- <br />quired prior to, or during well rehabilitation to fill data gaps or provide essential information. <br />I Subtask 2.02 — Agency and Utility Coordination. Option A AND ® Task 2.02 Deliverables <br />Option B., Wllldan will request utility atlases from utility companies . Well Assessment Summary Letter <br />known to operate and/or maintain facilities within the project areas for . Meeting agendas and minutes <br />reference In the Improvement plans. Willdan will conduct a utility roves- Utility notification letters <br />i tigation to identify utilities that will be Impacted and will research prior Utility matrix <br />rights to clearly identify parties responsible for relocation of the affected <br />utilities. Willdan will coordinate the utility Improvements with the identified utility companies, Including the Impacts <br />j to high-hazard/high-pressure facilities. <br />Per the Cttys Request for Proposal, coordination with utility companies will include: <br />I Prepare Initial request for utility Information such as atlas sheets, mapping, or as -built plans and develop util- <br />ity base map based upon Information received from utility, companies. <br />Comprehensive. Innovative.Proposal for On•Catr Engineering„ <br />lmusted. <br />' Fia'P No, 17-08$ <br />25E-733 <br />21 <br />