Laserfiche WebLink
slta facitiIWe and constmlnts. Wliden will catalog axiatIn, g condlNons and facilities through photographs and Heid <br />City of Santa Ana <br />ka <br />• Submit 30-, 60-, and I DO -Percent plans to those utility companies with facilities In Immediate project area, for <br />review and comment. <br />• Coordinate with uglty companies to Implement upgrade of facilities (upon request), as needed, within project <br />limit and Maintain contact tog. <br />• Determine any utility upgrades or installations that will be required to service existing and proposed Improve - <br />rents and coordinate installation of required upgrades with each affected utility company <br />i <br />• Lead efforts to identify ownership of unknown utility lines <br />Task 3 - Environmental Compliance and Permits - OpV*n A and Option B <br />t <br />" <br />It is anticipated that the projects will qualify for Categorical Exemption Section 15301 class 1(c) under existing- <br />d <br />highways and streets improvements that allows for roadway Improvements for the purpose of public safety and <br />has no significant effects on the omrironment. Wgidan will perform its due diligence as part of this task to verify <br />-} <br />exemptions criteria set by California Environmental Quality Act (CEQA) under Article 18 of Categorical Exomp- <br />,.J <br />tions and make necessary recommendations to the City, The City's Planning Division will make the final environ- <br />mental determination. To satisfy CEQA requirements for the project, Willdan will prepare a notice of exemption <br />for the city's use. We will assist with posting of the notice and with fling the Notice of Exemption with the County <br />lir <br />Clerk. <br />If Wigdan believes that further detailed emrirornmental studies and reports are needed to comply with CEQA and <br />or National Environmental Protection Act (NEPA), subject to confirmation by City Staff, Wilidan will most and dis- <br />cuss with the applicable resource/regulatory agencies to confirm the necessary work effort and Identify the cost <br />and schedule to prepare the environmental reports, applications for <br />permits and obtain clearance through all applicable agencies as adds- 12 Task 3 Deliverables <br />tmonal scope of worts. As part of Clean Water Act, a NPDES permit • CEQA Categorical Exemption <br />t - <br />may be required for alternate discharging during well rehabilitation. Form <br />v <br />Task 4 - Preliminary Engineering - Option A and Option B <br />Subtask 4.09 - Site Vlaft and Evaluation. Visual inspection is important for quality assurance and ensures a <br />i1 <br />slta facitiIWe and constmlnts. Wliden will catalog axiatIn, g condlNons and facilities through photographs and Heid <br />notes to be used as a reference during design. <br />ka <br />An initial assessment will be performed to evaluate the existing condition of the water well. Based on the Initial <br />evaluations, rehabilitation options will be proposed. The entire well will have to pulled and the casing will have to <br />be video Inspected. Common causes of reduced well capacity could be sanding, rupture of casing, mineral build- <br />up, heavy encrustation, screen damage, screen clogging or mechanical failures of the pump. Depending on the <br />assessment, rehabilitation could include brushing and bailing casing, replacing ruptured casing, adding an elon- <br />gated nozzle to bull to reduce sand flow, chemical treatment, remachine the pump and or rewind. After the initial <br />i <br />evaluation, Willdan will work with City's current maintenance and repair contractor to rehabilitate the well or will <br />work with the City to bid out the project <br />3 <br />Subtask 4.02 - Field Survey and Right -of -Way. Wlldan will perform a field survey to ensure the acouracy <br />d <br />and consmactability of the final construction plans. For this project the survey will: <br />P Establish right-of-way through recon research ancUor survey.. <br />-} <br />Option A: Ground Survey to map the existing facilities and utility Subtask 4.0.2 Deliverables <br />,.J <br />alignment. The utility surrey will include manholes, covers, and . One electronic copy of all field sur - <br />depth of cover when required. vey data In Microstation VBI format <br />0 Option B: Topographic/ground survey will be required to deter- <br />etermine <br />lir <br />mineexisting grades and facilities. To ensure acceptable cross -slopes full street sections will be surveyed <br />and analyzed at 2Voot intervals, driveways, and at approaches. The topographic survey shall extend a mini- <br />mum of 200 feet beyond limits of construction within the public right-of`way, where possible. Full street sec- <br />tions Include obtaining field data at all control or critical points, such as CL, BCR, ECR, and at any grade <br />breaks between lips of gutters, and(or edges of pavement, and flow lines: Where applicable to the project <br />scope, survey'of private property Improvements shall be Included. <br />-~ <br />Subtask 4.03 - Gootechnloal Investigation and Pavement Rehabilitation Strategies. All geotechniod <br />v <br />Investigation and analysis shall be performed by a state -licensed gootochnieai engineer with expertise in pave- <br />ment design, Wilidan will conduct geotechnical Investigations to measure the existing pavement sections and <br />collect representative samples of subgrade sobs for laboratory testing as described below. The task work in- <br />; <br />etudes: <br />Camprehonstve, Innovative. Trusted Proposal for t)mGall Engrneerfng, <br />< <br />RFP No. V-083 <br />25E-734 <br />