Laserfiche WebLink
GEOSCIENCE TERRY& WATICINSJR.PG, CHG <br />��� Senior Goothydrologist: <br />Mr. Watkins has over fourteen years of experience In many different types of <br />Projects, Including BeDhydrologic Investigations, groundwater quality studies, <br />artificial reritargt Projects, water wall test drilling programs, sea water <br />desalination programs, and The management and supervision of water well <br />projects Including; sitin& design, aquifer pumping test analyses and well <br />construction. Usted bikaw are various examples of Mr. Watkins' experience: <br />AW <br />City'Of South Pasadena —110-habillitatian of Wilson Well 112. 2016 <br />Developed rehabillif * ation recommendations Ovid work pian for contractor <br />activitle& Served a 6 ProlOct and construction manager during rehabilitation, <br />redevelop ment, and testing of the well This work successfully doubled <br />Production capability of this walf, <br />City of Huntington Beach — Replacement of Well No.1 <br />anagement <br />2014 to Present <br />Prepared preliminary design documents and drawings as well as technical <br />-10"rolm <br />no e ent <br />plans and specifications forthe drilling, construction, development, and <br />testing of the City of Huntington Beach Replacement Well No. 1. Will provIrig <br />construdlon management services, Including well design recommendations, <br />during orrnstructionvactivitler which should begin sadDnd quarter of 2017. <br />State Polytechnic <br />West Valley Water District — Rialto Calton Monitoring Well No. 1. <br />UnIvOrtlty, Pomofia, 2001 <br />2015 to 2010 <br />Project manager for the drilling, deslg% construction, andidevelopmentof a <br />60massional aesistrations; <br />910 ft staInlers steel monitoring welfto serve as 6 sentinel well monitoring <br />611fornfa Professional Geoloclst <br />perchlorate migration. <br />(No. 9046) <br />certified California Hydrogeologist, PICG Water District. 2016 to Present <br />(No. 1038) Project manager overseeing all aspects of this Project. Tasks completed to <br />date Include well siting assessment and recommendation, drafting of technical <br />plans and specifications, contractor bid assistance, and permitting with <br />regulatory agencies. tbnstruction and testing are scheduled to begin In <br />March, 2017 <br />'V��Y - <br />PQX <br />25E-545 <br />