My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Rate Schedule <br />Effective January 1, 2018 through December 31, 2018. If contract assignment extends <br />beyond that date, a new rate schedule will be added to the contract N <br />ENGINEERINd SIERVICES <br />HOURLY WE <br />Principal <br />$185 <br />Project Manager <br />$100 <br />QualityAssurance manager <br />$:ISO <br />Senior Engineer <br />$185 <br />Project Engineer <br />$130 <br />'firafto Engineer <br />$1-25 <br />Associate engineer <br />$115 <br />Assistant Engineer <br />$110 <br />EnWricering7echniclan <br />$90 <br />Designer <br />$1.10 <br />(ADD Drafter <br />$85 <br />Administration <br />$75 <br />MUNICIPAL.SERVICES <br />HOURLYRAT�' <br />Principal <br />$230 <br />Project Executive <br />$11as <br />Program/Prolea Director <br />$175 <br />Assistant Project Manager <br />$135 <br />City Engineer <br />$135 <br />Plan Check Engineer <br />$120 <br />Planner <br />$100 <br />Public Works Technician <br />$90 <br />Permit Toohniclan <br />$65 <br />CONSTRUCTION -SERVICES <br />HOURLY RATE. <br />Senior Construction Manager <br />$166 <br />Construction Manager <br />$:145 <br />Project Manager <br />$135 <br />ReelderittAgineer <br />$JA0 <br />Office Engineer <br />$120 <br />Project Controls Engineer <br />$1.100 <br />Labor Compliance/Doouments Control <br />$78 <br />Construction Observer (Non Prevailing Wage) <br />$98 <br />Construction Observer (Prevailing Wage) <br />$1.18 <br />Building Inspector (Non Prevailing Wage) <br />$85 <br />Surveying (2�parson survey Drew) <br />$250* <br />REIMBURSABLE EXPENSES <br />COST <br />Reproduction <br />cost <br />Consultant Services <br />Cost + 15% <br />Automobile Transportatio n <br />$,54 per mile <br />Delivery, Freight, Courier <br />cost <br />Agency Fees <br />Cost <br />Commercial Travel <br />Cost <br />*Assumes prevailing wages ate applicable for fieldwork. <br />I <br />25E-550 <br />
The URL can be used to link to this page
Your browser does not support the video tag.