Laserfiche WebLink
H <br />TAIT & Associates, Inc, <br />On -Call Engineering Services <br />A typical TAIT ONQC Program Includes the following steps: <br />• Project Manager (PM) Transmits Design Documents to the QA/QC Manager - PM Initiates the <br />QC process at agreed upon project milestones. <br />• WQC Manager conducts Initial review - The CtAIQC Manager reviews the submittal with the <br />PM to obtain project information and conducts a limited review on the submittal's <br />completeness. <br />• Review of the Submittal — The submittal Is reviewed using TAIT's Internal checklists. Necessary <br />corrections are Identified on the submittal which Is returned to the PM. <br />• PM to Addresses QC Comments - The QA/QC Manager and PM review the QC cornments to set <br />a course of action. Any proposed Value Engineering (VE) measures are reviewed to determine <br />the appropriate next step (Le.- Implement the VE measure, reviewthe VIE measure with the city, <br />or conduct additional analysis to determine the feasibility and potential cost savingS1 The <br />reviewed submitted Isthen returned to the design team. <br />• PM finalizes:Dosign Documents for Submittal to the Agency - The PM meats with the design <br />team to monitor progress 4nd verify Incorporation of the QC comments Into the design <br />documents. Deviations from the QC comment are reviewed for acceptance. <br />RELEVANT PROJECT ExPERIENCE <br />On -Call Engineering Contracts <br />Ex: ORANGE Couny PuBlig Wogxs�ON-CALL LAND <br />PLANNING AND ENGINEERING SERVICPS <br />County of Orange, CA <br />TAIT & Associates, Inc. (TAITY was retained by the County of Orange to <br />provide on -call Land Planning and -Engireering Services. TAIT also assists <br />CCPW - OC Planned Communities In the review of development <br />applications for new planned communities In South County, and In the <br />evaluation of County -owned properties for redevelopment opportunities. <br />OTHER ON -CALL ENGINEERING CONTRACTS <br />• on -Call Engineering, City, County, & Port of <br />Son Diego <br />• On -Call Engineering, City of Newport Beach <br />• On -call Engineering, City of Lake Forest <br />• On -Call Engineering, City of Irvine <br />• On -Call Engineering, Port of Long Beach <br />• on -Call Engineeringi Orange County <br />Sanitation District <br />On -Call <br />Surveylve <br />SOCCCD <br />Aefercnce� <br />James Campbell <br />(714) 567-1742 <br />Key Stem. <br />PIC: Jacob Vandervis <br />PM: Todd Schmieder <br />PE Chris Engelbach <br />Client: <br />OC Public Works <br />Costs: Various <br />Project Date$ <br />2011-Present <br />On -Call Engineering, City of Lake Elsinore <br />On -Call Engineering, City of Mission Viejo <br />Portola Parkway Resurfacing Project <br />Lake Forest, CA <br />TAIT was selected by the City of Lake Forest to provide civil engineering, surveying, geotechnical <br />engineering and federal funding assistance services on the Portola Parkway Resurfacing Project from Alton <br />Parkway to El Toro Road. The project limits Include a total of 2 miles of arterial roadway rehabilitation on <br />Portola Parkway which a 6 lane arterial roadway with bike lanes extendingthrough the City of Lake Forest, <br />21ITAIT page 19 <br />E-568 <br />lip <br />111 <br />r P <br />J <br />