Laserfiche WebLink
TAIT& Associates, Inc. <br />On -Call Engineering Services <br />on -site Storm Drain design Including Hydraulic calculations and utilization of the <br />most current Low Impact 8MPs. <br />Orange County Animal Care Facility, City of Tustin, Project Engineer, 2016 <br />Chris Is currently a Project Engineer on this Orange County Animal Care Facility <br />In the City of Tustin. The project Includes Public Sewer, Water, r1raWater, <br />Water Quality, On -site Utilities, and Grading plans. Chris Is responsible forthe <br />public Sewer, Water, and Fire Water plans <br />Vons-Alberuorts Distribution Center, City of El Monte, Project Engineer, 2016 <br />Chris Is currently the Project Engineer on this 36 acre Industrial Project which <br />Includes Demolition, Grading, and Utility Research, Chris Is responsible for the <br />Demotion, and Grading Plans as well as coordination with Utility Providers <br />These plans Include the removal end disposal of Hazardous materials as well as <br />the protection of existing ground -water monitoring wells and grading design <br />which duplicates existing flow. patterns, <br />Llmonite marketplace, City of Jurupa Valley, Assistant Project Manager, 2015 <br />Chris was the Assistant Project Manager and Engineer for this 39 acre mixed use <br />developm ant In the City of Jurupa Valley, This mixed use project combined <br />Retail development with private, high -density, residential. Chris was responsible <br />for the Tentative Tract and Parcel Maps, Site: Development Plan, on and off -site <br />Street Improvements, Water Quality, HydrologV,,Storm Drain, Rough Grading, <br />and Precise Grading Plans. Off -site Street improvement Plans Included <br />relocation of traffic signals, roadwayw!denIng, new signing and $trIping, <br />addition of ADA ramps, bus tum-outs, and horse trails, and development of I <br />mile of unpaved rural dirt road, <br />Stonerldge, County of Riverside, Assistant Project lvlanoger� 2015 <br />Chris was the Assistant Project Manager and Engineer for this 700 acre Master - <br />Planned residential community in Riverside County. This project Included <br />Tentative Maps, Phasing Exhibits, Street Improvements, Water Quality, <br />Hydrology, Storm Drain, Rough Grading, Precise Grading, and Traffic Studies. <br />Chris was responsible for Street Improvement, Rough Grading, Storm Drain, and <br />Phasing of this project. Street Improvement plans Included the development of <br />20 miles of now roadway along with signing, stripping and sIgnalization. <br />Crossroads at Chino Hills, City of China Hills, Assistant Project Manager, 2015 <br />Chris was the Assistant Project Manager and Engineer for this 15 acre high <br />density residential development. This project included on-sIte Street, Utility, <br />Storm Drain, Water Quality, and Grading. Chris was responsible for on -site <br />Street, Sewer, Water, Grading and Storm Drain design. <br />70 <br />it <br />I <br />r <br />Lb <br />'I �L <br />Appendix I Page 13 <br />2 E-592 <br />