TAIT & Associates, Inc.
<br />PEN
<br />On -Call Engineering Services
<br />Ali Bastani, PE, GE, PhD I Lead Geolechnical Engineer
<br />Dr. Busuild, an atijunct faculty member at Cal
<br />Poly rotational, has room than 20 Years or
<br />diversified experience in goolechnicall and
<br />earthquake engineering. His experience covers
<br />a wide variety of transportation projects
<br />Including design and construction support for
<br />roadways, bridges, oil([ retaining structures
<br />(catifilever, tieback, soil nail, and MSE walls)
<br />within and hernial tile County of Orainge. Be
<br />has served tile County during various on -call
<br />getamhalical culdnecring contracts since 2006.
<br />Dr. Hasten!'$ technical oxilinisc and extensive
<br />experience enhances tile learn capability to
<br />economically address the gcoloolinical aspects
<br />of the Type Scle-clion, roundation, laid
<br />Materials Reports for tile Countys upcoming
<br />transportation projects in a linicly manner using
<br />tile narst recent PHWA and Calvaus
<br />,approaches.
<br />Project Management Slope Stability
<br />Scistuic Hazard Analysis Sharing
<br />slabilizAtion
<br />roundation Design Landslide Analysis
<br />2003 Doctor of Philosophy Civil and
<br />Environmental Engineering, University of
<br />California, Davis
<br />1991 Master of Science Civil and
<br />Inivirimmuctral Engineering, University of
<br />California, Davis
<br />1988 Ifachelor of Science Civil
<br />Engineering, polytechnic ofTchrau
<br />Professional (1claccludcal rilitincer
<br />1999/Califianda No. Or 2438
<br />Professional Civil 1: '
<br />.11glaccr
<br />199510difurala No. C 53924
<br />Los Pabrotars Parkway, County of Orange ā Rancho Mission
<br />Vlelo,CA
<br />Ruill-7ollars, Inc. and GIVIU closely collaborated during design and
<br />construction of this project. Dr. Bastard served as the Project
<br />Goolecludcall Engineer of Record Ili charge of tile design and
<br />construction or approximately s-muc long Los Patrenes Parkway
<br />project in Orange County, California. This new roadway Is aligned to
<br />extend the Raide 241 Freeway four Oso Parkway to OrteWi Highway.
<br />Geotecludcal design ofthis pmjcct included lardiankractat staldiflyAtion
<br />using deep wit raising against latent spreading, largo arm.% grading.
<br />slope stability of Ili& claffill stop", sculement c"luation, and
<br />parventent design recommendations for appsaxintillety 2 million
<br />square feel of the proposed road. Conventional methods fouparverne"t
<br />design were compared with iftcultative design recommendations,
<br />including soil-centent Imatilicant, googrid, full-dopth asphalt concrete,
<br />and composite asphalt concrete with aggregate base. Each option was
<br />also evaluated for construction cost, construction scheduling, and the
<br />estinialed another of trucks required to transport materials. Hosed on
<br />this analysis, the preferred recommendation was tile soll-ccruent
<br />option as it resulted fit no estimated $6 million savings or nearly 40
<br />perecat savings over the conventional pavement method.
<br />Chlipuba Canyon Bridge, Planning Area 2, County of Orange ā
<br />Rancho Mission Viejo, CA
<br />Provided peer revicav services during design and Inotechnical
<br />engineering services during construction of file &span, 1,400-frot
<br />long, and 80-loot high bridge. Worked collaboaratively w0h the
<br />structural engineer to complete tile foundation design, 'file bridge
<br />berna; were supported by 9. and I 0-foot diameter CIDH piles while the
<br />allotment lvalls were supported oil 1.5-foot diatucterCIDI-I pics. Bent
<br />piles were supported by skin friction within the bedrock and were
<br />dosilpred to resist the potential loarls duo to lateral spreading. Bridge
<br />foandations lverer affected by liquefaction, earthquakc-induced
<br />sculanical, and lateral spreading (if tile underlying alluvial soils. our
<br />analyses included vertical unit lateral capacity design of the large
<br />diameter shafts with consideration or lateral spreading,
<br />Allen Parkway Gap closure, Lake porest ā city or Lakc rarest,
<br />CA
<br />Project Manager in cluare or the ticinechnival design and construction
<br />quality assurance of Allan Parkway Gap Closurc project. This project
<br />include([ approxhuxtely one rudc of six-lant: roadway through natural
<br />hillsides of Orange County. The design efforts included slope stability
<br />analy.scs, evaluation of timuilable hydro -collapsible alluvium depth, laid
<br />roadway Pavement struclural section. Dr. Basund also tuanaged tile
<br />9colechnical observation, testing, and material inspection of this APWA
<br />and ASCE award -winning project.
<br />Ili WLā
<br />'25E-601
<br />Appendix I Page 22
<br />
|