Laserfiche WebLink
TAIT & Associates, Inc. <br />PEN <br />On -Call Engineering Services <br />Ali Bastani, PE, GE, PhD I Lead Geolechnical Engineer <br />Dr. Busuild, an atijunct faculty member at Cal <br />Poly rotational, has room than 20 Years or <br />diversified experience in goolechnicall and <br />earthquake engineering. His experience covers <br />a wide variety of transportation projects <br />Including design and construction support for <br />roadways, bridges, oil([ retaining structures <br />(catifilever, tieback, soil nail, and MSE walls) <br />within and hernial tile County of Orainge. Be <br />has served tile County during various on -call <br />getamhalical culdnecring contracts since 2006. <br />Dr. Hasten!'$ technical oxilinisc and extensive <br />experience enhances tile learn capability to <br />economically address the gcoloolinical aspects <br />of the Type Scle-clion, roundation, laid <br />Materials Reports for tile Countys upcoming <br />transportation projects in a linicly manner using <br />tile narst recent PHWA and Calvaus <br />,approaches. <br />Project Management Slope Stability <br />Scistuic Hazard Analysis Sharing <br />slabilizAtion <br />roundation Design Landslide Analysis <br />2003 Doctor of Philosophy Civil and <br />Environmental Engineering, University of <br />California, Davis <br />1991 Master of Science Civil and <br />Inivirimmuctral Engineering, University of <br />California, Davis <br />1988 Ifachelor of Science Civil <br />Engineering, polytechnic ofTchrau <br />Professional (1claccludcal rilitincer <br />1999/Califianda No. Or 2438 <br />Professional Civil 1: ' <br />.11glaccr <br />199510difurala No. C 53924 <br />Los Pabrotars Parkway, County of Orange — Rancho Mission <br />Vlelo,CA <br />Ruill-7ollars, Inc. and GIVIU closely collaborated during design and <br />construction of this project. Dr. Bastard served as the Project <br />Goolecludcall Engineer of Record Ili charge of tile design and <br />construction or approximately s-muc long Los Patrenes Parkway <br />project in Orange County, California. This new roadway Is aligned to <br />extend the Raide 241 Freeway four Oso Parkway to OrteWi Highway. <br />Geotecludcal design ofthis pmjcct included lardiankractat staldiflyAtion <br />using deep wit raising against latent spreading, largo arm.% grading. <br />slope stability of Ili& claffill stop", sculement c"luation, and <br />parventent design recommendations for appsaxintillety 2 million <br />square feel of the proposed road. Conventional methods fouparverne"t <br />design were compared with iftcultative design recommendations, <br />including soil-centent Imatilicant, googrid, full-dopth asphalt concrete, <br />and composite asphalt concrete with aggregate base. Each option was <br />also evaluated for construction cost, construction scheduling, and the <br />estinialed another of trucks required to transport materials. Hosed on <br />this analysis, the preferred recommendation was tile soll-ccruent <br />option as it resulted fit no estimated $6 million savings or nearly 40 <br />perecat savings over the conventional pavement method. <br />Chlipuba Canyon Bridge, Planning Area 2, County of Orange — <br />Rancho Mission Viejo, CA <br />Provided peer revicav services during design and Inotechnical <br />engineering services during construction of file &span, 1,400-frot <br />long, and 80-loot high bridge. Worked collaboaratively w0h the <br />structural engineer to complete tile foundation design, 'file bridge <br />berna; were supported by 9. and I 0-foot diameter CIDH piles while the <br />allotment lvalls were supported oil 1.5-foot diatucterCIDI-I pics. Bent <br />piles were supported by skin friction within the bedrock and were <br />dosilpred to resist the potential loarls duo to lateral spreading. Bridge <br />foandations lverer affected by liquefaction, earthquakc-induced <br />sculanical, and lateral spreading (if tile underlying alluvial soils. our <br />analyses included vertical unit lateral capacity design of the large <br />diameter shafts with consideration or lateral spreading, <br />Allen Parkway Gap closure, Lake porest — city or Lakc rarest, <br />CA <br />Project Manager in cluare or the ticinechnival design and construction <br />quality assurance of Allan Parkway Gap Closurc project. This project <br />include([ approxhuxtely one rudc of six-lant: roadway through natural <br />hillsides of Orange County. The design efforts included slope stability <br />analy.scs, evaluation of timuilable hydro -collapsible alluvium depth, laid <br />roadway Pavement struclural section. Dr. Basund also tuanaged tile <br />9colechnical observation, testing, and material inspection of this APWA <br />and ASCE award -winning project. <br />Ili WL— <br />'25E-601 <br />Appendix I Page 22 <br />