My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />TAIT Schedule of Fees <br />RISING TO THE CHALLSH69 <br />1. Ernployee Classification Hourly Rate <br />06 — Engineering/Architact Assistant ................................... ...... ......... ................ ................. 70.00 <br />18 — Project Administrator ................................................... ............. ...... — ........ .................... 90.00 <br />04 - Designer I ..................................................................... _ .......... ..... _ .............. ........................ 110.00 <br />10 - Designer 11 .............................. ................................ ....................................................... ....... 135.00 <br />03 - Project Engineer / Project Architect / Senior Environmental Scientist ................................... 165.00 <br />02 — Project Manager / Licensed Surveyor. . ..................... ........................................................... 180�13D <br />17 - Senior Project Manager / Senior Surveyor / Senior Architect., . ............................. L ....... ....... 200,00 <br />01 - Principal ................................. ........................... .......... _ .............................. ............... .... �210.00 <br />11 - Permit Specialist / Environmental Scientist I I CADD Technician .......................................... 100.00 <br />09 - Research Analyst / Lead -Asbestos Technician / Environmental Scientist 11 ......................... 110.00 <br />07 —Field Surveyor ... 1L.1.1.1 ........... ............. ............... ..................... _ ................ ............. .......... 90.00 <br />08 — Field Surveyor Party Chief.-, ........ ...... ... — ......... ........................................ ........................ 125.00 <br />00 - Two man survey crew .................... .................. ...................................... ..................... 310.00** <br />22 - One Man Survey Crew with Robotics— ......... ........................... ............ ................ ....... ..... 200.00** <br />00 — Three Man Survey Crew—, ..... ................ ............. ...... ................ ................................. ..... 400.00** <br />The hourly rate for client authorized overtime and for representation at hearings and meetings after 6:00 p.m. <br />will be Involoed at 1.6 times the posted rate. <br />The above rates are inclusive of phone charges, fax charges, software and licensing fees, and photocopying <br />charges, <br />" Survey hourly rates based on Prevailing Wage Rates as of 6/1612017. <br />2. Mileage, Travel and Per Diem <br />Auto Mileage, IRS Rate plus 15 percent <br />Air Travel and Auto Rental: Actual cost plus 15 percent <br />Per Diem: Actual cost of lodging and meals, plus 16 percent <br />3. Materials and Supplies <br />Office and CADD supplies are included In the hourly rates, Prints, plots and reproductions are charged at <br />cost plus 16 percent from commercial blueprint companies. In-house reproduction charges are as follows: <br />R uns Bobts Color Plots <br />Bond $ �96/61 $,95/s.f. $6.00/s.f. <br />Vellum `1.38181 1.65181. 7.50/8.f. <br />4. Reimbursable Expenses <br />Will be billed at cost plus 16 percent Client Will pay directly for all permit and agency fees: otherwise mat <br />Plus 150/0. SUbconsultant invoices will be billed at cost plus 15%. <br />6� Insurance Coverage <br />General I -lability. $5,000,000 <br />ErroisVOmlsslons: $1,000,000 <br />California Workers'Compensation - Statutory <br />Certificates of Insurance coverage will be provided upon request. <br />Waivers of Subrogation (If required) will be billed as a 2% surcharge on all invoices, <br />Special endorsements will be billed to the client at cost plus 16% on the first prdjeat. <br />INTEREST OF 1-1/2 PERCENT PER MONTH WILL BE CHARGED ON ALL PAST DUE ACCOUNTS. <br />:Fees57 <br />25E-609 <br />
The URL can be used to link to this page
Your browser does not support the video tag.