My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ppmr,0SAL ON -CALL ENGINEERING SERVICES 6, '4041 <br />RFP NO.: 17..083 <br />City oi Santa Ana <br />Bus Stops <br />It Is assumed that the bus line along Mile One Street will remain active. The bicycle buffer prohibits the buses <br />to pull into the curb closest to the sidewalk, therefore a bus platform Is necessary adjacent to the outside <br />(fans #3) travel lane, Mark Thomas will provide a few proven designs for bus stop design along corridors with <br />Class IV bike lanes for consideration and will provide a recommendation on a case -by -ease scenario, <br />Storm Drain Upgrades <br />Storm drain Improvements within this portion of Mile One Street will be per the CIVs Master Drainage Plan. <br />Mark Thomas will conduct a hydrology analysis to verify the location and sizes of the proposed Inlets and <br />hydraulic analysis and modeling to confirm the Master Plan's recommendations for main line Improvemerits4 <br />Water Quality Management <br />Mark Thomas will prepare a Water Quality Management Plan (WQMP) with specific BMPS to satisfy the <br />EIR ranuirements and the Cihi's I — Im of D-1 �t <br />F. .,,&,,a <br />requirements. Similar to those Installed at other parkway <br />locations for similar projects, a low maintenance and easily <br />implemented bloretention system, such as Fliterra, could <br />be Installed. The unit cost of these systems Includes the <br />requirements desired by the City of BMPs. <br />Utilities Coordination <br />Mark Thomas'approach to the utility coordination task Will <br />Include the typical "ABC" process from Caltrans, where <br />major and minor risk Items are identified. We will take a <br />second step which Is to be located those conflicting utilities <br />to a satisfactory level of confidence using a combination of FllterraO Bioretention System <br />pothollng and other locating strategies that may be more <br />cost efficient. This additional effort will reduce risks during construction and provide both the City and Mark <br />Thomas the Information necessary to make informed decision during the design phase. <br />25E-629 <br />
The URL can be used to link to this page
Your browser does not support the video tag.