My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br />City of Santa Ana <br />Project Team <br />Project Manager <br />Mr. Tyrone Peter, PE will serve as Project Manager and be responsible for delivery of services In accord- <br />anoa with the established scope of services for projects awarded under this on -Owl contract. Mr. Peter pos- <br />sesses a strong work ethic and leadership skills that enable him to provide clear priorities and direction In <br />project delivery. Using his ability to assess his staff's strengths, Mr. Peter positions his team members <br />where they can be most successful. He uses his collaborative nature to build and maintain consensus <br />career, Mr. Peter has served as <br />among a variety of stakeholders to the benefit of project delivery. During his <br />Project Manager, Civil Engineering Task Leader, Supervising Engineer, Senior Engineer, Design Engineer, <br />and Designer for over 200 street Improvement projects with design contracts ranging from $5,000 to $2.9 <br />million. <br />Mr. Peter develops trusting partnerships with project stakeholders through open and honest communication. <br />lie will work closely and oollaboratively with the City's project representatives to determine optimal use of <br />ri <br />Wilklan's project team, While a highly cost-Offaclive team has been assembled for this project, Mr. Peter will <br />continuously look for ways to Improve efficiency and effectiveness. <br />Subconsultant Team <br />Wilidan's vast staffing resources enable us to provide services With a minimum of subGonsultant assistance. <br />For this on -call contract, our In-house team will be augmented with one subconsultant — AeroTech Surveys, <br />Inc. for field and aerial surveys and electrical engineering, Willclan ensures all suhconsultants provide the <br />same caliber of performance that Willdan provides by holding our subconsultants accountable to Wilidan's <br />high standards of performance, scheduling, and budgetary controls. For faderal-Istate-funded projects, Will- <br />dan has a database of disadvantaged business enterprises that we Y411 utilize to cull select specialty disol- <br />plines In support of the Ofty's stated project DHE goal. <br />- Mapping, lno,, doing business as AeroTeoh Surveys, Is a GaIllomia corporation founded <br />Schmidt Geornatic <br />*1 years ago. It Is a state-oartifled woman -owned small business enterprise. The firm provides aerial map- L J <br />ping services supported with land surveying services. Under the direction of a California-Ilcensed land sur- <br />veyor, the staff at AeroTech provides comprehensive services to meet client mapping needs. They plan the <br />aerial control layouts, flight coverage, Imagery acquisition, photogrammettlo mapping, and CAD editing. <br />AeroTech's survey crows set and survey the aerial control network and provide s(Wspeolfic surveys. Project <br />capabilities Include monument recovery, monument preservation, baseline control networks, benchmark el- <br />evation surveys, alignment surveys, cross sections, deformation surveys, and more. <br />L <br />A <br />10 <br />Wprehonsivo. InnovativG, Trusted. Proposal for On -Call �nglnooring, <br />COM RFP No. 1?-088 <br />25E-668 <br />
The URL can be used to link to this page
Your browser does not support the video tag.