|
City of SantaAria
<br />Tyrone Peter, PE
<br />Project Manager
<br />Profile Summary
<br />Education: BS, Engineering and CMI Engineering, Tamil Nadu College of Engineering
<br />Civil Engineering, Murugappa. Polytechnic
<br />Regit"lon: OMI Engineer, California No. 81888
<br />Affillations. American Public Works Association
<br />American Society of Civil Engineers
<br />Experience. 11 Years
<br />Mr. Tyrone Peter is an accomplished civil engineer for multi-disicipline and muffl-agenoy Infrastructure pro-
<br />jacts and is known for providing Innovative, quality engineering services to ensure project delivery within
<br />budget and schedule. As the project manager for the Citys On Call Engineering Services project, with quali-
<br />fied staff and resources, he will be responsible for successful project delivery,
<br />Mr. Peters 11 plus years of experience managing and designing all types of public works projects provide a
<br />solid foundation to understand what Is needed to deliver a successful project and make him the perfect fit
<br />for overseeing the ordire project as well as specific civil onglinsering tasks His comprehensive experience
<br />includes design of state highway, now street, street widening, street realignment, pavement rehabilitation,
<br />light rail and railroad, grade separation, flood control facility, water, and sewer projects. Mr. Peter has super-
<br />vised feasibility study, project study report, project report construction document preparation as well as
<br />L
<br />grade certification Issuance, construction administration, and construction Inspection.
<br />Relevant Prolect Experience
<br />r
<br />Emerald Day Main Gate Safety improvements, Emerald Say Service District, Laguna Beach, Callfor-
<br />J
<br />"go. %irva r1luumuliflu I aom�wuuul I mpullolula lul Uvololul It Ul mu,,lVil awl vl�wvwllw FRUF"1141W
<br />necessary reports, plans, specifications, and estimates documentation, Performance of these responsibill-
<br />ties required expertise and knowledge In street, traffic, drainage, structural, and pavement design, ADA
<br />standards, public outreach, pedestrian safety, arid water quality. W111dan provkled divill and traffic engineer-
<br />Ing design and other appurtenant services for safety improvements at the main gate entrance. Improve-
<br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accammodate the
<br />roadway widening and landscaping; installing upgraded lighting, ADA-compliant curbs and ramps, and to-
<br />talning and monument walls; widening the right -turn pocket and installing a median; and installing street
<br />striping and signage within Coltrane' right-of-way,
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Project Manager responsi-
<br />ble for overall project management and oversight required for the corridor Improvements from Alameda
<br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge In street
<br />and pavement design, ADA standards, public outreach, environmental documentation, Green Street design,
<br />and watershed management planning. The Improvements Involved Increasing traffic capacity by reconflgur�
<br />11
<br />Ing the roadway from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median
<br />lighting; sidewalk, curb and gutter, and drIveway approach reconstruction; ADA-compilant ramps; parkway
<br />trees; artistic elements, corridor entrance monument; bus shelter and bus WITIOLds; and traffic signal modifl-
<br />cations, Services provided Included civil, traffic, pavement, and drainage engineering; landscape architec-
<br />ture, survey and right-of-way engineering; and utility relocation.
<br />orange Line Extension, Brutoco Engineering & Construction, IncJLo$ Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, California. Civil Engineering Task Leader responsible for provId-
<br />Ing and overseeing all civil Improvement design required for the design/build of the MOL extension from the
<br />Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Performance of
<br />these responsibilities required expertise and knowledge In Intersection design, bike lanes, ADA standards,
<br />street geometric design, light -rail standards, parking lot and roadside safety design. WlIdan prepared plans,
<br />specifications, and estimate for street widening, raised landscaped medians, Irrigation system, ADA access
<br />curb ramps, bicycle paths, park -and -ride and parking lot facilities, traffic signal modifications, communica-
<br />Von conduits, and signing and striping. Three stations were constructed or reconstructed.
<br />Proposal for On-Cmil Engineering,
<br />Wpretionsive. innovative. Trusted.
<br />com RrP No. J.7-083
<br />25E-670
<br />
|