<br />Los Alamftos Boulevard Median Improvements, City of Los Alamitos, Calmornia. Project Manager to-
<br />sponsible, for overall project management and oversight required for the improvements between Cerritos
<br />Avenue and Katena Avenue. Performance of these responsibilities required expertise and knowledge In
<br />street Improvement, pav6ment rehabilitation, public outreach, signing and striping, street lights, and planting
<br />and Irrigation. Improvements Involved raised median, pavement delineation, landscape and Irrigation Im-
<br />provements, street lighting and trafflo signal Improvements at Intersections with
<br />Florlsta Street and Sausalito Street, There was minor traffic signal modification at Intersections with Katellis
<br />Avenue and Cerritos Avenue.
<br />PlacentlaMetrol.Ink Station Phase (and[[, Orange County Transportation Authority, Orange County,
<br />California. Project Manager responsible for providing and overseeing all civil Improvement design required
<br />for Infrastructure Improvements for the now station. The project alts Involved approximately 4.76 acres to
<br />provide a MetroLInk commuter rail station that meats current and future transit demand and ADA require-
<br />mente4 The project goal fostered train ridership growth In the region. The station was planned as part of a
<br />key component of transit-ortentsd development envisioned in the Westgate Specific Plan for the City of Pla-
<br />centla. The project Improvements Included street, railroad track, and pedestrian Improvements; rail plat-
<br />forms; and lighting, signing and striping of four parking facilities for 426 vehicles.
<br />13owns Street Widening, City of Ridgeorest, California. Civil Engineering Task Leader responsible for
<br />providing and overseeing all civil Improvement design required for the widening Improvements. Parfor-
<br />manGe of these responsibilities required expertise and knowledge In alternative pavement design, bons-
<br />fWcost anallyals, right-of-way engineering, street design, and utility coordination. The project Includes en%A-
<br />ronrinentall compliance, right-of-way research, and design. The project limits are Upjohn Avenue and Ridge -
<br />crest Boulevard. Improvements Include street widening and now curb, gutter, curb ramps, and sidewalks.
<br />The preliminary engineering services Include uflW research, right-of-way research, field Investigations, soils
<br />testing, and ground survey.
<br />Street Improvements Phase 11, City of Los Alamltos, California. Project Manager responsible for overall
<br />project management and oversight required for resurfacing of the following projects In the Phase 11 olty-wids
<br />program:
<br />a Via El Mercado Street Improvements
<br />- Old Town Wee Improvements (Chestnut Street, Walnut Street, Florista Street)
<br />Commercial Street Improvements (Cerritos Avenue, Ball Road, Reagan Street, Humboldt Street, Portal
<br />Drive, Winners Circle, Los Alamitos Boulevard, Los Vaqueros Cirole)
<br />Performance of these responsibilities required expertise and knowledge in pavement rehablIltaflon strate-
<br />gies, ADA standards, and signing and striping. Wilidan conducted site reconnaissance to observe Ole pave-
<br />mont condition, conducted Coring, testing and engineering analysis and summarized the findings In a ge-
<br />otechrilcal report Per the recommendation, the City streets within the project limits were ground and resur-
<br />faced with 2-Inch thick asphalt -rubber hot mix or removed and replaced with asphalt concrete over aggre-
<br />gate base or with joint plain cement concrete, All manhole, water valve, anode, and monitoring well covers
<br />within the project limits were adjusted to grade. Curbs and driveways were protected In place, Sidewalks
<br />were improved and ramps were Improved to current ADA requirements.