|
City of Santa Arta --- ----
<br />Mohaern Rahlmlan, PE, GE
<br />Material Testing Engineer
<br />Profile Summary
<br />Education: MS, Civil Engineering, Tehran University, Tehran
<br />Registration: OMI Engineer, California, No� 73396
<br />Geotechnical Engineer, California, No. $059
<br />Experlencet 29 Years
<br />Mr. Mobsen Rahlmlen possesses expertise In gootschnical and material engineering, testing, Investiga-
<br />tion, design, and construction and has lent that expertise to a wide spectrum of public works projects, Mr,
<br />Rahlmlan has substantial experience In conducting and managing geotoohnical and material testing and
<br />Inspection services during construction, He has performed diversified geotechnical assignments, including
<br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and
<br />slope stability analyses. Mr. Rahimian experience Includes gootechnical, civil, and structural design and
<br />construction management.
<br />Relevant Project Experience
<br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Califor-
<br />nia. Geoteohnical Engineer responsible for quality assurance materials testing. Wilklan provided civil and
<br />traffic engineering design and other appurtenant services for safety Improvements at the main gate an -
<br />trance. Improvements Involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />modato the roadway widening and landscaping; Installing upgraded lighting, ADA-compliant curbs and
<br />ramps, and retaining and monument walls; widening the right -turn pocket and Installing a median; and ln�
<br />stallind street striping and signage within Caltrans' right-of-way.
<br />Placentia MetroUnk Station Phase I and 11, Orange County Transportation Authority, Orange County,
<br />California. Geotechnical Engineer rsSPOhsible for quality assurance materials testing required for Infra-
<br />structure Improvements for the now station. The project site Involved approximately 4.75 acres to provide a
<br />MetroUnk commutei, rafli station that meets current and future transit demand and ADA requirements. The
<br />project goal fostered train ridership growth In the region, The station was planned as part of a key compo-
<br />nent of tranalt-orlented development envisioned In the Westgate Specific Plan for the City of Placentia, The
<br />project Improvements Included street, railroad track, and pedestrian Improvements; rall platforms; and light-
<br />Ing, signing and striping of four parking facilities for 425 vehicles.
<br />Orange Line Extension, Brutoco Engineering & Construction, IncJLcs Angeles County Metropolitan
<br />Transportation Authorityo Los Angeles, California. GeotechnIcal Engineer responsible for quality assur-
<br />anoo materials testing required for the design/build of the MOL extension from the Chatsworth Station to
<br />Canoga Station In the San Fernando Valley along Canoga Avenue, Willdan prepared plans, specifications,
<br />and estimate for street widening, raised landscaped medians, Irrigation system, ADA access curb ramps,
<br />bicycle paths, park-and-rida and parking lot facilities, traffic signal modifications, communication conduits,
<br />and signing and atHping.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Gootechnical Engineer
<br />responsible for quality assurance materials testing required for the corridor Improvements from Alameda
<br />Street to Hunt Avenue. The improvements Involved roadway widening from four to six lanes; pavement re-
<br />habilitation; landscape and hardsGape medlanw, median lighting; sidewalk, curb and gutter, and driveway
<br />approach reconstruction; ADA-compliant ramps; parkway trees; artistic elements, corridor entrance monu-
<br />ment, bus shelter and bus turnouts, and traffic signal modifications. Services provided Included civil, traffic,
<br />pavement, and drainage engineering; landscape architecture, survey and dight-of-way engineering; and utll-
<br />Ity relocation.
<br />�i'A Comprehensive. Innovative, Trusted,
<br />Proposal for rin�Coll Engineering,
<br />RFP No. 17-OSS
<br />25E-673
<br />
|