Laserfiche WebLink
. t <br />City of SantaAna <br />Gary Gordon, PE <br />% f Structural Engineering Task Leader <br />Profile Summary <br />Education: BS, Civil Engineering, California State University, Chloo <br />Registration: Civil Engineer, California No. 42176 <br />Affiliations: Atnerican Public Works Association <br />American Soclety of Civil Engineers <br />American Concrete Institute <br />Experience: 32 Years <br />Mr. Gary Gordon has 32 years of comprehensive experience, Including project management, design, and <br />construction management of bridge, roadway, traffic, signal, waterline, sewer, drainage, and airport projects, <br />In 2015, Mr. Gordon was placed In charge of Willdan' bridge and structural engineering team. With this new <br />assignment, he now oversees projects such as Marlposa County's rehablillatlontroplaoement of live bridges <br />that Is currently In the preliminary engineering phase, <br />Mr. Gordon's career Includes serving as a staff member of the Shasta County Department of Public Works, <br />Coltrane Division of Structures, and the Cfty of Redding's Department of Public Works performing detailed <br />and complex design, construction management, and division management and supervision. Throughout his <br />career, Mr. GordoWs focus has been on the delivery of road and bridge projects and the various appurte- <br />nances associated with them. <br />Mr. Gordon has dealt vOth complex environmental compliance Issues Involving CEQA and NEPA as well as <br />developed considerable experience with resource agency permitting Issues. The experience and Insight <br />gained from working directly with these agencies have proven Invaluable In understanding and appreciating <br />the varying needs of the different " of agencies that Willdan serves and developing the beat solutions <br />for those needs. <br />Relevant Project Experience <br />Emerald Say Main Gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califor- <br />nia, Structural Engineering Task Leader responsible for responding to structural requests for Information <br />during construction and redesigning various structural elements to accommodate utility lines discovered <br />during construction. Performance of these responsibilities requires expertise and knowledge In various <br />structural building codes such as ACI, AASHTO, and CBO as well as construction practices and principles, <br />Wilidan provided civil and traffic engineering design and other appurtenant services for safety Improvements <br />at the main gate entrance. Improvements Involved road widening, guardhouse relocation and reconstruo- <br />tion; grading to accommodate the roadway widening and landscaping; Installing upgraded lighting, ADA- <br />compliant curbs and ramps, retaining and monument walls; widening the right -turn pocket and Installing a <br />medlan;arld Installing street striping and sIgnage within Caltrans'right-of-way. <br />Lakewood Boulevard/Dal Amo Boulevard Hot Spot Intersection Improvement, Chy of Lakewood, <br />California. Structure Engineering Task Leader responsible for overall structural design of culvert structural <br />and retaining walls. Performance of these responsibilities requires expertise and knowledge In various do. <br />sign codes such as ACI and LACFCD for work within a concrete channel under Los Angeles county Flood <br />Control District jurisdiction. The project entailed widening Lakewood Boulevard north of Dal Amo Boulevard; <br />modifying/roplaoing median Islands; widening Dal Amo Boulevard; modifying traffic signals; relocating street <br />lights per streettimedian Island modifications; modifying a box culvertlehannel wall; and extending a Class 11 <br />bike lane. <br />comprehensive. Innovallve. Trwfted. <br />Proposal for on -Call Engineering, 13 <br />RFP W 17-083 <br />25E-675 <br />