|
r1l
<br />City of Santa Ana ------
<br />Salvador Lopez
<br />Environmental Task Leader
<br />Profile Summary
<br />Education: 8S, Urban and Regional Planning, California State Polytechnic University, Pomona
<br />Experience: ISYsars
<br />Mr. Salvador Lopez has more than IS years of planning experience that spans all aspects of planning, In-
<br />cluding current, advance, and environmental planning, as well as solve transportation plannIng and housing
<br />and community development. He Is highly experienced at managing muld-cilsoliplinary teems In the develop-
<br />ment of policy and long-range planning documents for public agencies.
<br />Relevant Project Experience
<br />Firestone Boulevard Capacity Enhancement, City of South Gets, California, Environmental Compll-
<br />anes Task Leader responsible for providing and overseeing all environmental services required for the cord-
<br />dor Improvements f rom Alameda Street to Hunt Avenue. Performance of these responsibilities requires ex-
<br />pertise and knowledge In City and County standards, policies, and procedures; general plan practices; and
<br />NEPA/QEQA conformance. The Improvements Involved roadway widening from four to six lanes; pavement
<br />rehabilitation; landscape and hardscape medians; median fighting; sidewalk, curb and gutter, and driveway
<br />approach reconstruction; ADA-compliant ramps; parkway trees, aftlic elements. corridor entrance monu-
<br />mbnt; bus shelter and bus turnouts; and traffic signal modifications, Services provided Included civil, traffic,
<br />J"
<br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and util-
<br />Ity relocation,
<br />Garfield Avenue Corridor Improvements, City of Paramount, California. Environmental Compliance
<br />Task Leader responsible for providing and overseeing all environmental services required for street Im-
<br />modate a third lane In each direction; street resurfacing; two concrete Intersections; concrete sidewalk, curb
<br />and gutter, and driveway approach reconstruction; catch basin construction; streetsoape Improvements for
<br />raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic
<br />signal modifications at nine locations along the Garfield Avenue corridor. Services Included civil, traffic, and
<br />drainage engineering; survey and mapping; utility rel ocation. landscape architecture; and pavement mao-
<br />agament.
<br />Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood. Environmental
<br />Compliance Task Leader responsible for providing and overseeing all environmental services required for
<br />complete streeVgreen street Improvements between the north City limits and Del Arno Boulevard, Perfor-
<br />mance of these responsibilities requires expertise and knowledge In 04 and County standards, policies,
<br />and procedures; general plan practices; NEPA/CEOA conformance, complete streets, sustafnablifty plan-
<br />nlng; and low -impact development standards, Improvements involved street widening and median improve.
<br />ments; Class If blko lanes In both directions; turn lanes, landscape planting and Irrigation; overhead distribu-
<br />tion and transmission power undergrounding; sidewalk, curb and gutter, and driveway approach reconstruc-
<br />flon; street resurfacing; catch basin construction; storm water quality Improvements to comply with Green
<br />streets policy, bike lookers, bus shelter, and traffic signal modifications. Services provided'Inoluds civil, traf-
<br />fic, pavement, drainage, and gsollsohnical engineering; landscape architecture, survey and right-of-way en-
<br />gineering, and Willy coordination and relocation.
<br />J
<br />41WCcmpvehensKfe, InnovatIve. Plustod,
<br />Proposal for On�Call EnorreerIng,
<br />RFP No. V-083
<br />25E-678
<br />
|