City of Santo An*
<br />Michael Bustoo, PE, ENV, SP
<br />Water and Sewer Engineer Construction Manager
<br />Profile Surnimary
<br />Education: BS, Civil Engineering (Magna cum Lauds), California Polytechnic State University, San Luis
<br />Obispo
<br />Coltrane Reeldw Engineer Academy
<br />Registration., Civil Engineer, California No. 73173
<br />Envision Sustainability Professional, Institute for Sustainable Infrastructure
<br />Affiliations: City Traffic Engineers
<br />American Public Works Association
<br />Institute of Transportation Engineers
<br />Experience. 16 Years
<br />Mr. Michael D. Bustos is responsible for design and construction management of projects such as road.
<br />way reconstructions, drainage Improvements, pipeline,% pavement rehabilitation, street Improvements, and
<br />grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded projects
<br />over the last five years. He has gained valuable experience In on -site construction management, off-afts
<br />construction administration, Inspection, design, and plan checking during his IS years with Wilidan.
<br />Relevant Project Experience
<br />Trunk Water Replacement, Morongo Band of Mission Indiana, Banning, California. Project Ergl-
<br />neer/Constructlon Manager. Engineer of Record responsible for preparation of plans, specifications, and
<br />estimate for construction of I 6-Inch water main on Porters, Morongo, and Martin Roads, Mr. Bustois also
<br />served as Construction Manager during constmollon, and was responsible for contract administration, mate -
<br />dais testing, and public works observation,
<br />Firestone/Atlantlo Design, City of South Gets, California. Reclaimed Water Design Engineer. Mr.
<br />Bustos provided construction phase design support for installation of a I 0-Inch reclaimed water line on Fire-
<br />stone Blvd. The project was constructed by the City and maintained by Central Basin Municipal Water Dis-
<br />trict Willclan provided surveying, civil engineering, gootechnical engineering, and utility coordination ser-
<br />vices for street Improvements on Firestone Boulevard from Dorothy Avenue to Lotta Avenue and on Atlantic
<br />Avenue from Palate Street to Branyon Avenue. As part of our design services, WIlklan provided final civil
<br />plans, Including street design, storm drain, sewer and water relocation, traffic signal modification and Instal -
<br />lotion, signing and striping, street lighting, contract specifications, and engineers estimate for widening both
<br />Firestone Boulevard and Atlantic Avenue. In addition, Wiliclan prepared a project report and cost estimates,
<br />including aerial topography and street centerlines; roadway geometries; hydrology study; sewer study; water
<br />study, utility relocation concepts; gooteohnical recommendations; turn pocket lengths; landscaping,
<br />Rehabilitation of Well No. 25, City of South Gate, California. Project Engineer. Mr. Bustos assisted while
<br />managing the hydrogoologloal sub-oonsultant: Hopidne.0houndwater Consultants, Inc. (Hopkins) In provid-
<br />Ing well rehabilitation consultation services to the City. The wall had been out of service for three years due
<br />to a sanding problem. When In operation, produotion from the lower half of the 1,300 feet deep wall was
<br />providing only 20 percent of the overall well production. Following Initial consultation, Mr. Bustos and Hop-
<br />kina prepared a well condition assessment to allow the City to explore their rehabilitation options, than so-
<br />lect a method that would possibly allow the City to regain production from -the perforated zones of the exist-
<br />Ing casing. Mr. Bustoa facilitated well condition assessment and Inspection services during well cleaning
<br />and video survey (aided by HopkIns). The completed well review provided the City with an accurate as-
<br />sessment of the well's current conditions and recommendations for rehabilitation. Following the well condi-
<br />tions review, and at the request of the City, Mr. Bustos and Hopkins prepared specifications for the City's
<br />preferred rehabilitation method.