Laserfiche WebLink
City of Santo An* <br />Michael Bustoo, PE, ENV, SP <br />Water and Sewer Engineer Construction Manager <br />Profile Surnimary <br />Education: BS, Civil Engineering (Magna cum Lauds), California Polytechnic State University, San Luis <br />Obispo <br />Coltrane Reeldw Engineer Academy <br />Registration., Civil Engineer, California No. 73173 <br />Envision Sustainability Professional, Institute for Sustainable Infrastructure <br />Affiliations: City Traffic Engineers <br />American Public Works Association <br />Institute of Transportation Engineers <br />Experience. 16 Years <br />Mr. Michael D. Bustos is responsible for design and construction management of projects such as road. <br />way reconstructions, drainage Improvements, pipeline,% pavement rehabilitation, street Improvements, and <br />grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded projects <br />over the last five years. He has gained valuable experience In on -site construction management, off-afts <br />construction administration, Inspection, design, and plan checking during his IS years with Wilidan. <br />Relevant Project Experience <br />Trunk Water Replacement, Morongo Band of Mission Indiana, Banning, California. Project Ergl- <br />neer/Constructlon Manager. Engineer of Record responsible for preparation of plans, specifications, and <br />estimate for construction of I 6-Inch water main on Porters, Morongo, and Martin Roads, Mr. Bustois also <br />served as Construction Manager during constmollon, and was responsible for contract administration, mate - <br />dais testing, and public works observation, <br />Firestone/Atlantlo Design, City of South Gets, California. Reclaimed Water Design Engineer. Mr. <br />Bustos provided construction phase design support for installation of a I 0-Inch reclaimed water line on Fire- <br />stone Blvd. The project was constructed by the City and maintained by Central Basin Municipal Water Dis- <br />trict Willclan provided surveying, civil engineering, gootechnical engineering, and utility coordination ser- <br />vices for street Improvements on Firestone Boulevard from Dorothy Avenue to Lotta Avenue and on Atlantic <br />Avenue from Palate Street to Branyon Avenue. As part of our design services, WIlklan provided final civil <br />plans, Including street design, storm drain, sewer and water relocation, traffic signal modification and Instal - <br />lotion, signing and striping, street lighting, contract specifications, and engineers estimate for widening both <br />Firestone Boulevard and Atlantic Avenue. In addition, Wiliclan prepared a project report and cost estimates, <br />including aerial topography and street centerlines; roadway geometries; hydrology study; sewer study; water <br />study, utility relocation concepts; gooteohnical recommendations; turn pocket lengths; landscaping, <br />Rehabilitation of Well No. 25, City of South Gate, California. Project Engineer. Mr. Bustos assisted while <br />managing the hydrogoologloal sub-oonsultant: Hopidne.0houndwater Consultants, Inc. (Hopkins) In provid- <br />Ing well rehabilitation consultation services to the City. The wall had been out of service for three years due <br />to a sanding problem. When In operation, produotion from the lower half of the 1,300 feet deep wall was <br />providing only 20 percent of the overall well production. Following Initial consultation, Mr. Bustos and Hop- <br />kina prepared a well condition assessment to allow the City to explore their rehabilitation options, than so- <br />lect a method that would possibly allow the City to regain production from -the perforated zones of the exist- <br />Ing casing. Mr. Bustoa facilitated well condition assessment and Inspection services during well cleaning <br />and video survey (aided by HopkIns). The completed well review provided the City with an accurate as- <br />sessment of the well's current conditions and recommendations for rehabilitation. Following the well condi- <br />tions review, and at the request of the City, Mr. Bustos and Hopkins prepared specifications for the City's <br />preferred rehabilitation method. <br />Comprehensive. Innovative.Rusted. <br />Proposal for On,Gsll Enifineering 17 <br />RFP No. 17-M <br />25E-679 <br />