Laserfiche WebLink
City of SanU Ana <br />Brief biographies for our technical support team are provided below. <br />B$, Civil Engineering k 13 YeaW Fxparience <br />I <br />Ms. 87usana Sainionlos possesses strong project experience with right-of-way dri�nvingo, subdivision maps, parcel <br />mops, tract maps, and surveys. She Is expedenced In preparing geometric plans, project reporls, and project <br />1: G0,MI,EngIneorCaIkmIallo.37156 m MS. Gootechnical Engineering <br />151*1f It <br />Geotoohnical and Pavement 0 schnical Engineer, California - BS Equivalent, Geology <br />Pnninnarfm A"funt Kin 9prig w 514 Vanre'Eyniartanns <br />Mr, Ross Khlabanf performs diversified geotechniral engineering Involving soll mechanics and foundations, coil <br />stabilization, landslide analysis and stabifization, settlement evaluations, liquefaction studles;slope stability anal- <br />yses, laboratory testing, and inspection during construction, His vast experience Includes commercial, Industrial, <br />kridges, Loads, fragWM and water and wastewater facilities DMI008. <br />Chris Stone lCmdentials Profile <br />Projoct Role Civil Engineer, Arizona, No. 55200 w HS, Civil Engineering, Montana <br />Civil Drafter/Desiginor Graduate Courses, Mathematics, Ore- State University <br />gon State University and Engineering a 23 years, Experience <br />Mechanics, Montana State University <br />Mr. Chris Stone has experience In transportation and traffic engineering, street and roadway design engineering, <br />cat mapping, grading, and structural engineering. He has participated in all technical aspects of projects Including <br />pmlimlnnry onnineerina. constructloi i document p oration. and reviews. <br />AbnorCstla Crodentiole Profile <br />Project Rok w BS, Civil Engineering Cebu Institute of w 31 Yeam'Experlence <br />Civil DrafteriDealginer Technology. Philippines <br />a Los Angeles County Hydrologic <br />Method California State University, <br />BadWround Suounary <br />Mr. Abner Catily possesses expertise In design of flood control and drainage Improvements, grading and site <br />plans, hydrology studies, sower Improvements, storm drains, and streets and highways. He has extensive <br />knowledge of Coltrane, Los Angeles County Department of Public Works, and Orange County Environmental Man - <br />Project Role Engineer -In -Training, California No. I Year Experience <br />161058 <br />Civil Drafter/DesIgnor <br />BS, Civil Engineering, Callfomla State <br />PoMeohnio Univeraltv. Pomona <br />Mr. Alexis Escobar Is a recent graduate and has gained design experience providing engineering design assis- <br />lance to projects Involving street Improvements, distriottelty, entrance enhancements, parks, a now MetroLink train <br />station, corridor enhancements, and providing on-oall engineering design services. <br />12 Years' Experience <br />N <br />Mr. Bernardo Reyes Is responsible for preparation of CADD drawings utilizing both MicroStation and AuloCad for <br />public works project geometric plans and final plans, specif loatkins, and estimates. His experience Includes design <br />01 Comprehensive. Innovative, Trusted. <br />Propossi ror un-can Engineering, <br />RFP No. :1.7-083 <br />25E-680 <br />