Laserfiche WebLink
CitV Of Santa Ana <br />Project note <br />Civil Drafter/Designer <br />Orsdendele Profile --- <br />a Autodesk AutoCAD Corilflad Profes- P 17 Ym& Experience <br />sional <br />v Autodask AuloCAD Civil 3D Certified <br />Assool99 <br />fitacAground Summary <br />Mr, Randy. Shadowen is responsible for preparation of Micro Station and AuIoCAD drawings, both for geometric <br />plans and final construction bid <br />documents for a variety of local street, highway and railroad projects and flood con- <br />trol lorolects and for Drolects on <br />th state freeway and highway system th&t gare subject to Edqw by CalLmIM, <br />EgyWellington, PE <br />Cmdentials Profile <br />Pmleot Role <br />Civil Engineer, California, No. 25131 - Technical and Managerial Semi - <br />Water and Sewer Engineer <br />Traffic Engineer, California No. 968 nars; and Workshops <br />BS, Civil Engineering, California State - Resident Engineer Academy (UC- <br />Polytechnic University, Pomona rrs) <br />Graduate Courses, Public Administra- s 43 yearso Experience <br />.I -- <br />Mr. Ray Wellington has performed numerous infrastructure planning, funding, design and construction improve- <br />mant projects with specific experience in arterfall roadways, local streets, and highways Includes Initial project plan - <br />Ong, scoping, design oversight, right-of-way engineering, plan and specification reviews, bidding process, and oon- <br />striation management and Inspection. <br />ften Moore, PE OreclariftelsProf4 <br />Projwt Role Civil Engineer, Callomia No. 82724 n BS, Civil Engineering <br />DraITLe Engine r MS, Emdmnm2a!g!���Experfsnoo <br />BackgroundSummary <br />Mr. Ryan Moore is responsible for designing street, drainage, regional BMP, and sower tomfects. This Includes <br />preparation of hydrology and hydraulic reports, plans, specifications, and esfimata for storm drain, sanitary Sewer, <br />Project Role w 25 Years'Exporionce <br />Hydroloo I raulle Analmt <br />Oaokground$ummat�y <br />Mr. Kenneth Kdoger specializes in developing and executing hydraulic modeling software for flood control, storm <br />drain and sower related projects. He has performed hydrology and hydraulic calculations on numerous flood con- <br />I-rojeor tfole lo Landscape Architect, CA No. 17 Years! Experience <br />P Plantinq/Inigation Architect 1 4967 <br />Mr. Bryan Nguyen Is experienced with developing conceptual landscape plans with extensive graphic vignettes <br />such as photographic before and after simulations; and the preparation of construction documents, Mr. Nguyen is <br />proficient In prepaftg Irrigation water and landscape management specification documents and performing agency <br />contract landscape plan reviews. <br />ChrlstogtLe��SDJP Credentials Profile <br />Projeet Role w Civil Engineer, California No. 10 Years' Experience <br />Water Quality Engineer 83179 <br />x QSDIP, CA Stormwater Quality <br />AssoolLtlon No, 258�4 <br />BackgroundSummery <br />Mr. Christopher Kelley is responsible for design and review of public works Improvement projects, Including streets, <br />highways, storm drains, and water quality Improvements, He designs and reviews low -impact development reports <br />and best management practices under numerous M84 permits to comply with the National Pollutant Discharge <br />Elimination System MS4 Permit. <br />mprohonsiva. Innovauva. nusted. Proposal for on -call Enjonearing, <br />kFP No. 17-D88 <br />25E-681 <br />