Laserfiche WebLink
City of Santa Arts <br />K Submit 30-, 60., and I 00-percent plans to those utility companies with fladittles; In Immediate project area for <br />review and comment <br />a Coordinate with utility companies to Implement upgrade of facilities (upon request), as needed, within project <br />Undt and Maintain contact log. <br />* Determine any utility upgrades or Installations that will be required to oarvice existing and proposed Improve- <br />ments and coordinate Installation of required upgrades with each affected utgfty company <br />9 Lead efforts to Identify ownership of unknown uglify lines <br />Task 3 - Environmental Compliance and Permits - Option A and Qpdort B <br />it Is anticipated that the projects will qualify for Categorical Exemption Section 16801 Class 1 (c) under oYJstIng <br />highways and streets improvements that allows for roadway Improvements for the purpose of public safety and <br />has no significant effects on the environment. Willdan will perform Its due diligence as part of this task to verify <br />exemptions criteria set by California Environmental Quality Act (CEQA) under Article 19 of Categorical Exemp- <br />gone and make necessary recommendations to the City. The CIVs Planning Division will make the final onviron- <br />mordal determination. To satisfy CEQA requirements for the project, Wilidan will prepare a notice of exemption <br />I I --- �udth. In notic an'i"A hfillngth-Notlosof Exemptionwith the Coun <br />lor the Citya use. I.NovVil east.. ""�' t'ect rg M * <br />th. ty <br />If Wilidan believes that further detailed environmental studies and reports are needed to comply with CEOA and <br />or National Environmental Protection Act (NEPA), subject to confirmation by City Staff, W111dan will meet and dis- <br />cuss with the applicable resourcelregulatory agencies to confirm the necessary work effort and Identify the cost <br />and schedule to prepare the environmental reports, applications for <br />permits and obtain clearance through all applicable agencies as addl- 0 Task 3 Delliverables <br />r <br />floral scope of work. As part of Clean Water Act a NPDES permit k CEQA Categorical Exemption <br />b <br />may be required for altGmate discharging during well rehabilitation. Form <br />Task 4 - Preliminary Englineewing - Option A and Option R <br />Subtask 4.01 - Site Visit and Evaluation. Visual Inspection Is Important for quality, assurance and ensures a <br />common-sense assign. WPFda-n--wlg-co-n-dff-d-a-Ifte—vrsn-to-a-na n a compmriensive un wtaridin "one—exle-ting—, <br />r i <br />site facilities and constraints. Wilidan will catalog existing conditions and facilities through photographs and field <br />: <br />notes to be used as a reference during design. <br />i j <br />An initial assessment will be performed to evaluate the existing condition of the water well. Based on the Initial <br />evaluations, rehabilitation options will be proposed. The entire well will have to pulled and the casing will have to <br />be video Inspected. Common causes of reduced wall rapacity could be sanding, rupture of casing, mlneral build- <br />U <br />up, heavy encrustation, soman damage, semen clogging or mechanical failures of the pump, Deponding on the <br />assessment, rehabilitation could Include brushing and bailing casing, replacing ruptured casing, adding an elon- <br />gated nozzle to bull to reduce sand flow, chemical treatment, remachine the pump and or rewind. After the initial <br />IA <br />evaluation, Wilidan will work with City's current maintenance and repair oontractorto rehabilitate the wall or will <br />work with the City to bid out the project. <br />Subtask 4.02 - Field Survey and RIghVof­Way. Willdon will perform a field survey to ensure the accuracy <br />and constructability of the final construction plans. Forthls project the survey will: <br />• Establish right-of-way through record research and/or survey. <br />• Option A: Ground Survey to map the existing facilities and uglify Subtask 4.02 Deliverable$ <br />J <br />alignment The utility survey will Include manholes, covers, and w One electronic copy of all field sur- <br />depth of cover when required. vey data In Mforostation V81 format <br />• Option B: Topographle/ground survey will be required to deter, <br />mine existing grades and facilities. To ensure acceptable oros"lapas full street sections will be surveyed <br />and analyzed at 26-foot Intervals, driveways, and at approaches. The topographic survey shall extend a mini- <br />mum of 200 feet beyond limits of construction within the public right-of-way, whore possible. Full street see- <br />flons Include obtaining field data at all control or critical points, such as CL, BOR, ECR, and at any grade <br />breaks between lips of gulters, and/or edges of pavement, and flow lines: Where applicable to the project <br />scope, survey*of private property Improvements shall be Included. <br />Subtask,L03 - Geotechnical Investigation and Pavement Rehabilitation Strategies. All gootechnical <br />Investilgaton and analysis shall be performed by a state -licensed geotachnical engineer with expertise In pave- <br />ment design, Willdan will conduct gootachnical Investigations to measure the existing pavement sections and <br />oolled representative samples of subgrade soils for laboratory testing as described below. The task work In- <br />cludes: <br />Proposal for On -call lEngineerIng. <br />rehensive. InnovatIve, Trusted, <br />Arcomp RFP No. V�083 <br />25E-684 <br />