City of-Santa'Ana-
<br />Meld exploration Including coring, drilling, and sampling at three locations to the maximum drilled depth of 10
<br />feet below ground surface within the limits of the project site. Upon receipt of notice to proceed, a site visit
<br />will be performed to mark the coralboring locations and evaluate access conditions for drilling equipment.
<br />W111dan will call USA for underground utility locating at least 4B hours before any field work Is performed.
<br />However, all available subsurface utility Information should be provided/ Identified prior to Initiating field ex-
<br />ploration to reduce the potential for damaging existing utilities, Traffic control will be provided during drilling.
<br />Borings/ooree will be measured and visually logged In the field by an experienced representative. The log will
<br />Include pavement sections thicknesses and subgrade conditions. The samples will be transported to Wilk
<br />dana geatechnicall laboratory for testing,
<br />Laboratory testing of collected representative subgradle soils will determine their Index and engineering prop-
<br />erfies.
<br />Option A: Geolechnicall Investigation will be used to Identify the soil properties for the trenching and backfill of
<br />proposed utilities.
<br />Option B: Providing recommendations for alternative new pavement sections.
<br />Option 0: Performing a percolation test within a bortng
<br />drilled to a depth between 5 and 10 feet for BMP and green 18Subtask 4.03 bellverablos
<br />streets implementation Of needed). m Three hard copies of draft geotechnical
<br />Providing a draft report and presenting our findings, comlu- report and one electronic PDF copy
<br />stone, and recommendations for review by the City. After a Three hard copies of final geotechnioal
<br />receiving the Clity's comments, a final report Incorporating report and one electronic PDF copy
<br />the comments Y4111 be provided to the City. The report will be supported with a map Illustrating boring/core, lo-
<br />cations and a summary of laboratory test results.
<br />Subtask 4.04 — Preliminary Design Report Wilidan will complis a Preliminary Design Report (PDR) for
<br />review and approval by the City. The report will contain a summary of Subtask 4.04 Defilverables;
<br />th ' a Initial reconnaissance notes, utility provided information, field survey Preliminary Design Report
<br />findings, any photographs of conditions for discussion, and the base de-
<br />sign concept with preliminary construction cost estimate. The report will be discussed with City representa-
<br />tives to make reliable, cost effective decisions about the proposed street Improvements, water and sewer re-
<br />habliftationtreplacoment methods.
<br />During preparation of the PDR. Willdan will review existing Information, such as the pavement management
<br />report, city sewer and water documents and field review of the street to make recommendations regarding
<br />the construction needs, Including the location and extend of missing or damaged sidewalk, curbs and gutter,
<br />access raimps, driveways, sewer and water repairs. In addition, the report will address the disposition of
<br />existing utilities and coordination, and anticipated requirements,
<br />Task 5 — Plans, Specifications, and Engineers Estimate - Option A and Option B
<br />$ubtask 6.01 — Construction Plans.
<br />Wiltdan will prepare conceptual plans for City review, corn. 2 Task 5.01 Defiverables
<br />mant and approval, Upon approval of the concept plans, a Three hard copies of full-size conceptual plan
<br />the final design phase will be Initiated. W111dan will submit layout and one electronic PDF format
<br />plans at the 30-, 60-, and 100-percent levels of oomple- w Three hard copies of full-elza and half-size plan
<br />tion. The City will provide review comments at all design submittals at 30-, 80-, and 100-percent comple.
<br />stages, Wilidan will address comments received from the tion milestones, one electronic PDF copy, and
<br />submittal reviews, Including comments received from one electronic Microstatlon copy in VBI fonnat.
<br />other affected agencies and utilities. Wilidan will submit one, original, signed set of full-sized plans, a signed, un-
<br />bound, set of final specifications, and a copy of the final onginears opinion of construction cost to the City. One
<br />set of Mylars will be produced after 100% plans are approved by the City (upon request). Plans will conform to
<br />City standard plans and CADD standards and be prepared utilizing Microstation V81 software.
<br />Option A., The plans be prepared In sufficient detail to bid the rehabilitation of the Identified well — method to be
<br />determined by the City after review of the assessment report — and the proposed sewer and water facilities. Utll-
<br />Ity plans will be drafted at 40-scale and plans will display all referenced standard plans Including trenching do -
<br />tails.
<br />Option B: The plans will consist of a Title Sheatf Typical notes, Roadway Plans, Construction Details, Sliming
<br />and Striping, Landscape, and Storm Water Blofiltration (it required In complete streets). The Roadway Plans will
<br />comprehenstve. Innovative. 11usted. PrOP0801 for On�Gsll Enfinesi-ing
<br />RFP Na V-M
<br />25E-685