My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citv Of sarft Me <br />L <br />RM <br />consist of two shoots and will be drafted at 20-scale, The Roadway Improvement Plans will Include the topo- <br />graphic survey and utirdy bass plan Information, limits of removal, and limits of repairs for pavement, curb and <br />gutter, driveway configuration, ADA curb ramps, etc. All other Improvement plan shouts will be drafted at 40- <br />scale. <br />Subbask 5.02 - Specifications. <br />Wifidan will prepare technical special provisions for bid- Took 6.02 Dellverablas <br />ding per Citystandarder. The City will provide bollorplate One electronic PDF copy and one electronic <br />Word copy of tochriloal and a sciall provisions <br />spacM=Hons. Special provisions will be prepared udll7lng <br />Greenbook and Caltrans formats (latest edition$). at 60- ard 100-poment compliffon milestones <br />Subtask 5.03 - Einglaeor's Construction Cost Estimate. <br />WlHdan will prepare a construction cost estimate W accompany Task 5.03 Deliverabies <br />[i <br />the 80-, 60-, and i 00-porcent plan dollverables, Quantity Calcula- k One electronic PDF copy and one elso- <br />tions and final construction coat estimates will be prepared In ao- ironic Excel copy of engineer's coat ed- <br />oordance with CRY requirements to establish the project budget. mate at concept and 30-. 60-. and I Do - <br />percent completion milestones <br />Task 6 - Construction Bidding Phase Sorvices - Option A and Opilm 0 <br />Wilklan will prepare a construction bid package per City <br />Task 6 Dolivarables <br />standards. Wilidan will advise the City of the appropriate <br />responses to bidders'technical questions. If an adden- * Construction bid package <br />durn Is determined appropriate by the City, Willdan will, P Addenda, as necessary <br />r, <br />prepare revised plans, specifications, andtor quantity as- w Logolbidderinquirles <br />firnatus, WlWn will provide support during construction bidding phase services and advertising period by: <br />. Attending p"d meeting <br />X Assisting In analysis of bids, as necessary <br />N Logging questions and responses to bidders' questions regarding the bid documents <br />L, <br />X Imuo addmW=-toW4=monts-t"rrowarquestioiiTratsed,-Itmquked <br />!--I <br />Task 7 - Pr6tronstruction and Job Site Meetings - Optildn A and Option B <br />WHIclan will attend the pr000nstruction mestingJob <br />Task 7 Defiverables <br />walk, and job-afte, meetings, as required, over the <br />Meeting minutes <br />course of construction. Wilklan assumes one precon- <br />struction meeting and three job site meetings, <br />Li <br />Task 0 - Respond to Requests for Information. and Submilittaiv - Option A ond Opflon B <br />WHIdan will provide responses to contractors requests <br />NTask 8 Dellverablin <br />for Information about the plans and specifications. This <br />a Log requests for Information and provide responses <br />task includes conferring with the City's construction <br />v Field design recommendations <br />manager, as Appropriate, regarding the requests to ad- <br />w Reld meeting minutes <br />dress unforeseen site conditions andtor provide field de- <br />P Design details <br />sign recommendations. Regularly scheduled construction observation is specifically excluded from this scope of <br />work. Up to 10 responses to requests for InfOrmatkin Are Included In the scope. <br />Task 9 - Prepare Record Drawings/As-Bullts - Option A and Option,& <br />Within 60 days following completion and Acceptance of <br />Task$ Dollverables <br />the project, Willdan will furnish the City with a complete <br />set of revised original tracings showing as -built conditions <br />Ono complete set of original record drawings on <br />on Mylar. Revisions will be solely based upon as -built In- <br />Mylar, one electronic PDF copy, and one Ml- <br />arostation V81 <br />formation provided by the Ofty's Donstnictlon manager and <br />the contractor. <br />Wcomprolnensivs. Innovative. Trusted. <br />Proposal for On -Call Rnglnoerinil, <br />RFP No. 17-083 <br />25E-686 <br />
The URL can be used to link to this page
Your browser does not support the video tag.