|
City of Santa Ana
<br />Relevard Project Experience
<br />Wilidan has Chosen the following representative summaries for completed projects that exemplify Wilidan's
<br />extensive expertise and relation to the Scope of Work detailed in the RFP.
<br />City of South Gate
<br />9660 Calffornia Avenue
<br />South Gate, CA 9080
<br />Clwnt Contact Arturo Cervantes Public Works Diec
<br />tor
<br />(323) 563-9512
<br />PrAk Dates: 20l6to2017f4-ehn---'&i-,4-
<br />Wilidan is providing civil and traffic engineering de- struction ongoing)
<br />sign and other appurtenant services for street im- Project Team. Pyrons Peter, David Knoll John Hf
<br />provements from Alameda Street to Hunt Avenue dalgo. Vanessa Alulkiz, Motaien Ashiman, Salvador
<br />funded through Metro and local funds. The project Is Lopez, Alexis Escobar, Ross Killabani, Ray Wallington,
<br />a complete rehabilitation of roadway improvements Mkhael Bustos, Kenneth Krieger, Randy Shadowan, Ber-
<br />that involve widening the street from four to six; reha- nardo Reyes, Susana Bardentos, Bryan Nguyen, Shafte
<br />bilitating street pavement sections, Including local- McCracken, Robert Buick Chns Stone, Edward Cox,
<br />ized removal and replacement of failed roadway- in- Givistopher Kelley. Kevin Custedo, Nicoll& Spann, Robert
<br />Isirke, Ryon Moore
<br />stedlinn landsenned and hardscanod medians Incl-d- Sun. Elroy Ki
<br />I
<br />Ing drought -resistance plants, Irrigation system, and lighting
<br />system; reconstructing deficient sidewalk, curb, gutter,
<br />driveway approaches, and ADA-noncompllant curb ramps;
<br />planting street parkway trees without Irrigation, green
<br />streets technologies, and complete streets
<br />Artistic elements and gateway corridor entrance are in-
<br />cluded in the design. Other improvements Include bus shel-
<br />ters and bus turnouts; tranic signal modifications with bat-
<br />tery backup, pedestrian countdown heads, and upgrades to LED where possible. Signals will be synchro-
<br />nized to reduce traffic congestion and improve bus speeds.
<br />Los Alamitos Boulevard Median Improvements
<br />City of Los Alamitos
<br />3191 Katalle Avenue
<br />Los Alamitos, CA 90720
<br />Willdan provided civil and traffic engineering and
<br />other appurtenant services for street improvements
<br />between Cerritos Avenue and Katella Avenue. As
<br />one of three Improvement segments, the project In-
<br />volves raised medians with landscaping and irdga-
<br />fion, hardware, decorative street lights, electrical re-
<br />ceptacles for seasonal tree lighting, tree uplights and
<br />monument signs. Median Improvements were opti-
<br />mized through traffic analysis and vehicle turning
<br />movement modeling.
<br />Crosswalks at four signalized Intersections will be re-
<br />moved and replaced With Integral colored concrete, A
<br />storm drain on Serpentine Drive will be modified. Por-
<br />tions of the project limits will receive a 12-inah-thick
<br />4 "A I �_f
<br />u - ep, i asp t cone, via over 8-Incl rutick com-
<br />pacted subgrade. Wilidan assisted the City with public outreach to gamer input through town hall meetings,
<br />open houses, and public hearings.
<br />Client
<br />Steven Mendoza, Community Development
<br />Contact.,
<br />Director
<br />(562) 431-3538 extension 300
<br />Project
<br />2015 to 2017 (design completed,, construc-
<br />Dates:
<br />tion ongoing)
<br />Project
<br />Tyrone Peter, David Knoll, John Hidalgo,
<br />Team.
<br />Malisen Rahimian, Michael Bustos, Randy
<br />Shadidwen, Bernardo Reyes, Susima Bar-
<br />fientos Bryan Nguyen, Sheila McCracken
<br />Robert Burch, Chda Stone, Edward Cox,
<br />Kevin Custado, Elroy 16epke
<br />A(Coniprehonsivis. Innovative. Trusted.
<br />PrOPOSal for On -Call Engineering 25
<br />RFP No. 17,083
<br />25E-687
<br />
|