City of Santa Anae_ '.1_
<br />INN,
<br />Orange Line Extension
<br />Los Angeles Metropolitan Transit Authorityl
<br />client contact. Scott McConnell, Project Manager
<br />Druloco Engineers and Constructors, Inc.
<br />(2t3) 922-7257
<br />One Gateway Plaza
<br />Project Dates: 2010 to 2012
<br />Los Angeles, CA 90012
<br />Project room: Tyrone Peter, David Knelt, Johnny
<br />The design -build MOL extension between Chats-
<br />Ghazal, John Nldatgo, Vanessa Murioz,
<br />Mollsen Rahimlan, Rosaftabaril, Ray
<br />worth and Canoga Stations In the San Fernando Val-
<br />Wellington MichaelBustos Kenneth
<br />ley along Canoga Avenue Is a dedicated roadway
<br />Kdeger, Randy Shadowen, Bemard*
<br />consisting of two 14-foot travel lanes. At stations, the
<br />Reyes, Susenta Bardentos, Bryan Ngu-
<br />bulsway lane widens to provide passing lanes for
<br />yen Sheila McCracken, Robart8urch,
<br />buses, The 28400t wide roadway Is within the Metro
<br />Chna Stone, Edward Coy, Christopher
<br />riniht-cf-wav and Is i Go feet wide In most locations —
<br />Kelley, Ryan Moore
<br />providing adequate room for landscaping as well as space for
<br />fences, privacy walls, drainage facilities, and a bikeway/pades-
<br />trian path adjacent to the busway.
<br />The busway was designed for future conversion to light-rall
<br />transit service. A Class I bikeway that Includes a pedestrian
<br />path was designed and constructed within the Metro right-of-
<br />way from the terminus of the existing MOL btkeway/pedestrian
<br />path at Canoga Avenue, north to Lassen Street and along Las-
<br />sen Street to connect within the existing bike path on the east
<br />side of the existing Browns Crook drainage channel. Street and
<br />pedestrian crossings were Improved on nine streets where the
<br />busway Intersects the crossing street. A bus parking lot was
<br />constructed on -the Metro�owned.property-at.MarillaStreet-and
<br />Owensmouth Avenue, Park -and -ride facilities were included at
<br />throe stations, providing approximately 1,074 additional park-
<br />Ing spaces. Design-bulld solutions and design creativity re-
<br />duced MTA`,9 construction estimate and saved over $61 million
<br />In construction costs.
<br />(;a
<br />Measure R Proled:001,dals CelabrateCranpletionaNetu,
<br />Orange Line Extension tor Chatsmdh Aturad of Schedule.
<br />Under Budget
<br />Emerald Bay Main Gate Safety Improvements
<br />Emerald Bay Service District Client Contact. Michael Dunbar, General Manager
<br />600 Emerald Bay (949) 494-8572
<br />Laguna Beach, CA 92661 Project Dates.- 2015 to 2017
<br />Willdan Is providing civil and traffic engineering de- Project Team; 7yrone Peter, David Knell. Johnny
<br />sign and other appurtenant services for safety Irn- Ghazal, Gary Gordon, Vanessa Mufloz, Moltstan Rahlm-
<br />provements connected with the community's main tan, Ross Kfilebam, Ray Wellington, Michael Bustris.
<br />gate entrance. The Improvements involve widening Kennett? Krieger, Randy Shadowen, Bernardo Reyes,
<br />Shamrock Road 25 fast, reconstructing the entrance Susena Barrientos, Sheila McCracken, Robert Burch, Ed -
<br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan
<br />Ing location; grading Shamrock Road and the adja- Moore
<br />cent slope to accommodate the roadway widening and
<br />desired landscaping; installing upgraded lighting; In-
<br />stalling ADA-compliant curbs, ramps and retatning/mon-
<br />ument walls; widening the right -turn pocket and In-
<br />stalfing a 175400t-long raised median at the Intersec-
<br />tion of Pacific Coast Highway and Shamrock Road; mit-
<br />Igating soil with 200 1 8-Inch diameter drilled displace-
<br />ment columns, and Installing street striping and sIgnago
<br />within Caltrans'right-of-way. The project required processing Caltrans encroachment permit and County of
<br />Orange general grading permit packages. Widening Shamrock Road proAdes an additional lane In each
<br />m'N� Proposal for On -Call Engineerft 2;1
<br />" Comprehensive. Innovative, Trusted. RFP No. 17-083
<br />25E-688
<br />
|