Laserfiche WebLink
City of Santa Anae_ '.1_ <br />INN, <br />Orange Line Extension <br />Los Angeles Metropolitan Transit Authorityl <br />client contact. Scott McConnell, Project Manager <br />Druloco Engineers and Constructors, Inc. <br />(2t3) 922-7257 <br />One Gateway Plaza <br />Project Dates: 2010 to 2012 <br />Los Angeles, CA 90012 <br />Project room: Tyrone Peter, David Knelt, Johnny <br />The design -build MOL extension between Chats- <br />Ghazal, John Nldatgo, Vanessa Murioz, <br />Mollsen Rahimlan, Rosaftabaril, Ray <br />worth and Canoga Stations In the San Fernando Val- <br />Wellington MichaelBustos Kenneth <br />ley along Canoga Avenue Is a dedicated roadway <br />Kdeger, Randy Shadowen, Bemard* <br />consisting of two 14-foot travel lanes. At stations, the <br />Reyes, Susenta Bardentos, Bryan Ngu- <br />bulsway lane widens to provide passing lanes for <br />yen Sheila McCracken, Robart8urch, <br />buses, The 28400t wide roadway Is within the Metro <br />Chna Stone, Edward Coy, Christopher <br />riniht-cf-wav and Is i Go feet wide In most locations — <br />Kelley, Ryan Moore <br />providing adequate room for landscaping as well as space for <br />fences, privacy walls, drainage facilities, and a bikeway/pades- <br />trian path adjacent to the busway. <br />The busway was designed for future conversion to light-rall <br />transit service. A Class I bikeway that Includes a pedestrian <br />path was designed and constructed within the Metro right-of- <br />way from the terminus of the existing MOL btkeway/pedestrian <br />path at Canoga Avenue, north to Lassen Street and along Las- <br />sen Street to connect within the existing bike path on the east <br />side of the existing Browns Crook drainage channel. Street and <br />pedestrian crossings were Improved on nine streets where the <br />busway Intersects the crossing street. A bus parking lot was <br />constructed on -the Metro�owned.property-at.MarillaStreet-and <br />Owensmouth Avenue, Park -and -ride facilities were included at <br />throe stations, providing approximately 1,074 additional park- <br />Ing spaces. Design-bulld solutions and design creativity re- <br />duced MTA`,9 construction estimate and saved over $61 million <br />In construction costs. <br />(;a <br />Measure R Proled:001,dals CelabrateCranpletionaNetu, <br />Orange Line Extension tor Chatsmdh Aturad of Schedule. <br />Under Budget <br />Emerald Bay Main Gate Safety Improvements <br />Emerald Bay Service District Client Contact. Michael Dunbar, General Manager <br />600 Emerald Bay (949) 494-8572 <br />Laguna Beach, CA 92661 Project Dates.- 2015 to 2017 <br />Willdan Is providing civil and traffic engineering de- Project Team; 7yrone Peter, David Knell. Johnny <br />sign and other appurtenant services for safety Irn- Ghazal, Gary Gordon, Vanessa Mufloz, Moltstan Rahlm- <br />provements connected with the community's main tan, Ross Kfilebam, Ray Wellington, Michael Bustris. <br />gate entrance. The Improvements involve widening Kennett? Krieger, Randy Shadowen, Bernardo Reyes, <br />Shamrock Road 25 fast, reconstructing the entrance Susena Barrientos, Sheila McCracken, Robert Burch, Ed - <br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan <br />Ing location; grading Shamrock Road and the adja- Moore <br />cent slope to accommodate the roadway widening and <br />desired landscaping; installing upgraded lighting; In- <br />stalling ADA-compliant curbs, ramps and retatning/mon- <br />ument walls; widening the right -turn pocket and In- <br />stalfing a 175400t-long raised median at the Intersec- <br />tion of Pacific Coast Highway and Shamrock Road; mit- <br />Igating soil with 200 1 8-Inch diameter drilled displace- <br />ment columns, and Installing street striping and sIgnago <br />within Caltrans'right-of-way. The project required processing Caltrans encroachment permit and County of <br />Orange general grading permit packages. Widening Shamrock Road proAdes an additional lane In each <br />m'N� Proposal for On -Call Engineerft 2;1 <br />" Comprehensive. Innovative, Trusted. RFP No. 17-083 <br />25E-688 <br />