Laserfiche WebLink
CltyofSont&An*_ <br />Michael Bustoal PE. SN% SP <br />Water and Sower Engineer Construction Manager <br />Profile Summary <br />Educatiom BS, Civil Engineering (Magna Cum Lauds), California Polytechnic State University, San Luis <br />Obispo <br />Caltrans Resident Engineer Academy <br />Reqlstiratfon: Civil Engineer, Callomia No. 73173 <br />Envision Sustainabrity Professional, Institute for Sustainable Infrastructure <br />Affiliations: City Traffic Engineers <br />American Public Works Association <br />Institute at Transportation Engineers <br />Experlonw. 16 Years <br />Mr. Michael D. Bustos Is responsible for design and construction management of projects such as road. <br />way reconstructions, drainage Improvements, pipelines, pavement rehabilitation, street Improvements, and <br />grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded projects <br />over the last five years. He has gained valuable experience In on -site construction management, aft -site <br />construction administration, Inspection, design, and plan checking during his 13 years with Wildian. <br />Relevant Project Experience <br />Trunk Water Replacement, Morongo Band of Mission Indians, Banning, California. Project Engl- <br />near/Construction Manager. Engineer of Record responsible for preparation of plans, 8pecifloations, and <br />estimate for construction of 16-Inch water main on Porters, Morongo, and Martin Roads, Mr. Bustos also <br />served as Construction Manager during construction, and was responsible for contract administration, mate- <br />dals testing, and public works observation, <br />Firestone/Atlantic Design, City of South Gate, California. Reclaimed Water Design Engineer, Mr. <br />Bustos provided construction phase design support for installation of a 1 O-Inoh reclaimed water line on Fire- <br />stone Blvd. The project was constructed by the City and maintained by Contra[ Basin Municipal Water Dis. <br />triat, Wilklan provided surveying, civil engineering, gootechnical engineering, and utility coordination ser� <br />vices for street improvements on Firestone Boulevard from Dorothy Avenue to at a a n a It <br />L to Av nu and o Atl n c <br />Avenue from Patarta Street to Branyon Avenue. As park of our design services, Wilidan provided final civil <br />plans, Including street design, storm drain, sower and water relocation, traffic signal modification and instal- <br />lation, signing and striping, street righting, contract specifications, and engineer's estimate for widening both <br />Firestone Boulevard and Atlantic Avenue, In addition, Wilklan prepared a project report and cost estimates, <br />Including aerial topography and street conterlines; roadway goometrics, hydrology study; sewer study; water <br />study; utility relocation concepts; gootechnioal recommendations; turn pocket langths; landscaping. <br />Rehabilitation of Well No. 26, City of South Gate, California. Project Engineer. Mr. Bustoa assisted while <br />!nanaging the hydrogeological sub -consultant: HopkIns.Groundwater Consultants, Ina, (Hopkins) in provId- <br />Ing well rehabilitation consultation services to the City. The well had been out of service for three years due <br />to a sanding problem. When In operation, production from the lower half of the 1,300 feet deep well was <br />providing only 20 percent of the overall well production. Following Initial consultation, Mr. Bustoe and Hop- <br />kins prepared a well condition assessment to allow the City to explore their rehabilitation options, then Be - <br />loot a method that would possibly allow the City to regain production from4he perforated zones of the exist- <br />Ing casing. Mr. Busies facilitated well condition assessment and Inspection services during well cleaning <br />and video survey (aided by Hopkins). The completed wall review provided the City with an accurate as- <br />sessment of the wall's current conditions and recommendations for rehabilitation, Following the well condi- <br />tions review, and at the request of the City, Mr. Bustos and Hopkins prepared specifications for the CIVS <br />preferred rehabilitation method. <br />WO Comprohonsive. innovative, Trusted, <br />PrOPOsa I for 011-Call Eniilneeft& <br />RFP No. *V-083 <br />25E-729 <br />