My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:07:58 AM
Creation date
6/18/2018 5:24:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />OCTA <br />Pavement Management Plan Agency Submittal <br />overall, the conclusion drawn from this PMP report is that the backlog for the entire pavement network is <br />evenly distributed across both the arterial and the local network. Additionally, existing funding levels in the <br />City CIP will not keep pace with rehabilitation needs over the next seven years. Since preserving street <br />condition and performance should be a priority to provide motorists with safety assurances, the City's goal <br />over the next seven years is to acquire sufficient pavement M&R funding to sustain the entire street pavement <br />network at "Good" condition or better. By achieving this goal, the City will remain eligible for the reduced <br />local match requirements for the renewed Measure M2 Competitive grant until FY 2024/25. <br />P a g e IS <br />55B-148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.