Laserfiche WebLink
INTERNAL SERVICE FUNDS <br />FINANCE & MANAGEMENT SERVICES PROGRAM <br />Building Maintenance - Facilities 07310100 <br />Statement of purpose , <br />To maintain safe, secure, attractive, and energy ejjlcient City facilities and igfi'astructure (assets) through preventive <br />maintenance (PM), certifications, energy management, and custodial services. <br />This program is responsible for maintaining over one million square feet that covers 38 city buildings including City Hall and the <br />Police Holding & Administration Facility. Asset Management is accomplished through an extensive preventive maintenance <br />program, which increases the life cycle of the asset while reducing repair and replacement costs. The program also manages <br />janitorial services (both in-house and contractual) needed to keep city facilities at a high standard of appearance and cleanliness. <br />'j Accomplishments m.;FY 2017 2018 j;;; <br />* Replaced 3rd floor domestic water supply to inmatearea of Police Holding Facility (AMES Plan). <br />* Main Library - Replaced all stair treads. <br />* Santa Anita Center- Replaced all entry doors for ADA compliance and security. <br />* Council Chambers -ADA improvements in public seating area. <br />* SCE OBF funded Project - LED lighting retrofit at PAAL Center. <br />* Obtained proposals and contracted for temporary roof repair for Fleet °p' Building. <br />* Replaced Heat Bundle at the Main Library to restore interior heating. <br />* Remsulated Main Library chilled water pipes in basement to address a mold concern, <br />* Replaced failed steam trap serving City Hall heating system. <br />* SARTC's air handler project completed. <br />* SARTC's boiler replacement completed. <br />* Initiated LED light upgrade at SARTC in phases to better manage costs. <br />* Installed screening in Plaza of the Flags parking structure per Interim City Manager. <br />* City Hall restroom faucet and angle stop upgraded. <br />* Relocated homeless article storage containers at Yard and fenced area to improve foot traffic safety and yard security. <br />* Replaced Council Chambers restromn exhaust system. <br />* Replaced Ross Annex can lights with LED -Phase 1. <br />* Designed and coordinated Council Chamber exterior public projection system. <br />* Replaced Santa Anita roof and replaced T1-11 exterior siding. <br />aAction Plan"for,l Y 2016.2019 <br />* Main Library — automate entry doors and comply with ADA regulations. <br />* Install fall protection on City Hall elevator penthouses (2 total). <br />* City Hall Bridge area—Replace expansion joint. <br />* City Hall— Water seal South side of high rise. <br />* SAPD — Replace 911, and walk in Freezer condensers. <br />* Council Chambers — develop plans to provide separate, secured, and ADA compliant restrooms for Council and the Public. <br />* SCE OBF funded Project — LED lighting retrofit at Corporate Yard. <br />* SCE OBF funded Project — LED lighting retrofit at SAPD, <br />* SCE Pilot Program—Lighting and HVAC control energy measures. <br />* Contract washing of exterior windows at City Hall, Police Department, and Main Library. <br />* Energy Measures — Seek opportunities to install Photovoltaic for: City Hall, Superblock, SARTC, SAPD, City owned <br />Parking. Structures <br />* Seek HVAC optimization measures at the Police Department. <br />* Continue to provide maintenance and repair for Grand Central Art Studio, PW -Train Station. <br />PERFORMANCE MEASURES"',- <br />;,. ,.`: .. _;.:.;. .=. r` <br />'Actual,' <br />.; , Actual <br />Esfimated <br />06jective - <br />=FY 73.16„ <br />:FY 18.17., ..,,'`;;FY <br />1118 v^ <br />„`r.-. ,FY'18.19 ,.'. <br />Service Level <br />Total square footage maintained <br />1,229,867 <br />1,229,867 <br />1,229,867 <br />1,229,867 <br />Number of Facility Maintenance Work Orders <br />1,352 <br />1,352 <br />2,692 <br />2,700 <br />Efficiency <br />- <br />Square feet maintained per Technician <br />City of Santa Ana <br />123,733 <br />123,733 <br />111,806 <br />111,806 <br />Industry Average <br />65,000 <br />65,000 <br />65,000 <br />65,000 <br />Effectiveness <br />%of Work Orders (Preventive Maintenance) <br />98% <br />98% <br />100% <br />100% <br />completed within 7 working days <br />3-6 <br />