| 
								    NTETRATECH 
<br />Man Hong (Eric) Yuen, PE, SE 
<br />Structural Design 
<br />Mr. Yuen has over eight years of experience in the design, 
<br />educatlon: 
<br />analysis and detailing in structural engineering. He is 
<br />S.S., civil Engineering; 
<br />knowledgeable In reinforced concrete, masonry, structural steel 
<br />Callfornla State Polytechnic 
<br />and wood frame design, and construction for a variety of building 
<br />university, Pomona, 2007 
<br />and infrastructure projects including reservoirs, water/wastewater 
<br />Registrations/Certifications: 
<br />treatment facilities, as well as seismic retrofit of existing 
<br />Profassionai Engineer. Colifornia 
<br />structures, 
<br />2009, No, 75983 
<br />EXPERIENCE 
<br />Structural engineer, California 
<br />2014, No. $177 
<br />Equipping of Wells 1-16, 1.17, and 1.10, Chino Basin Deselter 
<br />Col CES Safety Assessment 
<br />Authority, Chino, CA — Tatra Tech Is providing design and 
<br />Program Evaluator Tralnirig 
<br />construction engineering services for the equipping of three new 
<br />wells at three separate sites. The scope of the structural design 
<br />Professional Affiliations: 
<br />includes foundations for prefabricaated electrical enclosures, surge 
<br />American institute of steel 
<br />construction 
<br />tank, well pedestals, pipe'racks and supports. Services include 
<br />conceptual design, permitting assistance, final design, bid 
<br />Field Safety Cortificatioiis: 
<br />assistance, and construction assistance. Mr. Yuen served as the 
<br />Fail Protection (Ladders; 
<br />structural designer on this project, 
<br />Scaffolding, Aerial Lifts) 
<br />Design -Build -Build of Wells 21 and 22 Desalter, Irvine Water 
<br />0912010 
<br />District, Irvine, CA— Mr. Yuen served as Structural Design 
<br />N's Protection Training 
<br />Engineer for this design -build project. This project is a membrane 
<br />Respiratory Protection Training 
<br />water treatment plant that consists of a buried rectangular 
<br />Confined Space Training 
<br />(1/2015) 
<br />concrete wet well, a concrete tilt -up process building and 
<br />numerous concrete mat foundations. Pascal & Ludwig is our 
<br />office: 
<br />Design -Build Partner and also the prime contractor on the project. 
<br />San Dimas, California 
<br />Tetra Tech will work under Pascal & Ludwig through a 
<br />subcontractor agreement, 
<br />Years of Experience: 
<br />Rancho Del Rey Wellhead Treatment Facility, Otay Water Light 
<br />District Chula Vista, CA — Mr, Yuen served as Structural Design Years with Tetra Tech: 
<br />Engineer for the design of a 5,100 square foot masonry building, Eight 
<br />with a steel truss framed roof, which houses a well head, RO 
<br />treatment facility, disinfection equipment, conventionally 
<br />reinforced concrete clearwell pump station, control room, office 
<br />and storage area. The design of the building balances the functional water production 
<br />requirements with the aesthetic, architectural design of the exterior of the building, which was 
<br />critical for compliance with local planning agency requirements. 
<br />Burris Pump Station, Orange County Water District (OCWD), Anaheim, CA — Design 
<br />Engineer for the replacement of an existing pumping facility at the Burris Pump Station location. 
<br />Mr. Yuen was involved in the comprehensive design of the 0.8 MG buried circular wet well, The 
<br />new facility will allow OCWD to transfer up to 200 cubic feet per second from the Santa Ana 
<br />River, which will be and utilized for groundwater recharge to the Santiago Basins, Mr. Yuen also 
<br />reviews shop drawings and responds to RFIs during the ongoing construction phase of this 
<br />project, 
<br />Page 7 
<br />
								 |