| Eric Regueiro, P.E., ENV SP 
<br />CIVIL AND TRANSPORTATION ENGINEERING — 
<br />TASK MANAGER 
<br />Eric has more than a dozen years of experience in civil engineering for roadway and 
<br />land development projects throughout Southern California, His technical skillset 
<br />allows him to support a wide range of projects, from local roadway Improvements to major interchange, 
<br />grade separation, and regional transportation projects. His emphasis has been on street improvement 
<br />design, pavement condition analysis, grading end drainage, stormwatoY management, and sewer an 
<br />water system design., In.additlon, Eric uses both of the major design software programs - AutoCAD Civil 
<br />3D and Mlorostation/InRoads, and is able to design and model roadway plans using the client's. preferred 
<br />CAD software. 
<br />Professional Credentials 
<br />Bachelor of Science, Civil Englhearing, University of California, Irvine 
<br />Professional Engineer la California (#78101) 
<br />Envision Sustain Professional 
<br />American. Society of Civil Engineers, Associate Member 
<br />Relevant Experience 
<br />• Long Beach Citywide Pavement Maintenance 
<br />Management System, Long Beach, CA — 
<br />Project Engineer 
<br />• City of Anaheim, Gone Autry Way 
<br />Improvements (1.5.to State College Blvd,) & 
<br />State College Blvd, Improvements (West Side), 
<br />Anaheim, CA — Project Manager 
<br />,d Alameda Corridor East Construction Authority, 
<br />Phase 11 Grade Separations PS&E, Fullerton 
<br />Road Grade Separation, City of Industry, CA — 
<br />Project Engineer 
<br />® Artesia Boulevard Improvements, Buena Park, 
<br />CA— Project Engineer 
<br />• Baseline Road/Laurel Avenue Intersection 
<br />Widening, Fontana, CA -..Analyst 
<br />At City of Buena Park, Auto Center Drive Traffic 
<br />Signal and Median Design, Buena Park, CA — 
<br />Project Eng)near 
<br />• City of Fontana On -Call Pavement 
<br />Rehabilitatlon/Utillty Design, Fontana, CA — 
<br />Project Engineer 
<br />• C5U Long Beach, East Campus Road - Safety 
<br />Improvements, Long Beach, CA— Project 
<br />Manager 
<br />,i Diamond Bar Prospectors Road Street 
<br />Rehabilitation Project, Diamond Bar, CA — 
<br />Analyst 
<br />Kirk ey*Horn 
<br />i Expo Metro Line Construction Authority, Design 
<br />of LRT Phase 2, Los Angeles, CA — Project 
<br />Engineer 
<br />A Firestone Boulevard Improvements, Buena 
<br />Park, CA —Analyst 
<br />1 Fresno Marketplace at El Paseo, Fresno, CA — 
<br />Project Engineer 
<br />f La Habra Harbor/Lambert Intersection 
<br />Widening, La Habra, CA— Project Engineer 
<br />• Lakewood Boulevard and Cover Street 
<br />Intersection Improvements, Long Beach, CA — 
<br />Project Engineer 
<br />.d New Pedestrian Mall and Repairs to North 
<br />Deukmejian Way, Long Beach, CA — Project 
<br />Engineer 
<br />i Ocean Park Boulevard Complete Green Street 
<br />Project, Santa Monica, CA — Project Engineer 
<br />• Orange County Transportation Authority, 
<br />Preliminary Engineering and Environmental 
<br />Documentation for 17th Street Grade Separation 
<br />Project, Orange County, CA — Project Engineer 
<br />• RCTD,1.10 Bypass, Riverside County, CA — 
<br />Project Engineer 
<br />• RCTD, Mission Boulevard Bridge Replacement, 
<br />sub to Kleinfelder, Riverside, CA — Project 
<br />Engineer 
<br /> |