Laserfiche WebLink
CONTAOTINFO <br />kevin,inohtrgh�hvS.coitt <br />KEVIN MOUGH, Jr., PLS <br />949.685.0477 <br />Surveying Project Manager <br />EXPERIENCE <br />....................... ........... ............ <br />Mr, MoHwgh Ise licensed land surveyor with more than 35 years of experience. Kevin <br />35 years <br />manages NV5'ssurveying Operations In our Southern California Region. As survey manager, <br />EDWATION <br />he supervises all survoyingantl mapping oparatie is. This role Includes oversight of field <br />AA Mathematics <br />surveys, Construction staking, field crew supervision, field and aerial topographic surveys, <br />the preparation and quality control of final maps, record of surveys, legal descriptions, <br />LICENSES <br />right <br />of way mops, appraisal maps, boundary surveys and analysis, ALTA surveys, lot line <br />Professional,Land Surveyor <br />adjustments, constraint maps, condominium plans, and Corner records, <br />i-CA#6910._ - <br />i <br />project Experience <br />....... <br />..................................................................................... <br />SR-209, and SR-241- Eastern Transportation Corridor i Caltrans <br />Kevin provided all boundary analysis and right-of-way CADD project coordination for <br />i <br />this 26�mre transportation corridor project in Orange County. His responsibilities <br />Included supervision and approval and preparation of more than 500 legal <br />descriptions and exhibits for right -of -Way acquisition He supervised preparation of all <br />If <br />appraisal maps, right-of-way maps records of surveys, survey control maps, horizontal - <br />control calculations, and CADD-file management. Kevin served as the project manager <br />1 <br />for right of way for this Challenging prcieot, which covered the full Spectrum of right- <br />of -way mapping and engineering elements, tinder his direction, the right of way/ <br />mapping team evaluated title report restrictions and prepared project Constraint <br />Maps; developed Property Binders containing all information and legal data used to <br />for apprelsals and subsequent parcel acquisitions; prepared legal descriptions and <br />exhibits for various types of property rights ocqulsition Including fee acquisitions, <br />slope, drainage, roadway and utility easements, temporary construction easements, <br />and Joint Use Agreements and Consent to Common Use Agreements for more than <br />50-utility facilities. <br />1-5/1-405 and Stake Parkway interchange i Caltrans <br />As land surveyor -in -charge for this project, Kevin's duties covered densification of <br />horizontal and vertical control, design surveys, aerial mapping, right-of-way base <br />mapping and survey control maps for three miles of design Cross sections, His work on <br />the project included preparation of legal description and plats for right-of-way takes, <br />and preparation of appraisal maps and right-oll maps. <br />Foothill Transportation Corridor- Ciao Segment i Caltrans <br />Provided all boundary analysis and right of way GADD project coordination for the <br />five mile sagment of the Foothill Transportation Corridor project, Responsibilities <br />Included supervision and approval of preparation of more than 35 legal descriptions <br />and exhibits for right of way acquisition as well as supervision of preparation of all <br />appraisal (maps, right of way maps, records of surveys, survey control maps, horizontal <br />control calculations, and CADD file management. <br />Newhope Street Expansion i Caltrans <br />Surveyor in charge responsible forcompletingthe boundary survey and analysis to <br />5 <br />determine the existing street right of way, Caltrans right of way, and private ownership <br />boundaries, as well as the preparation and oversight of all legal descriptions and <br />exhibits required for the City of Fountain Valley to acquire the additional necessary <br />haht of wav for the nminrt. <br />