CONTAOTINFO
<br />kevin,inohtrgh�hvS.coitt
<br />KEVIN MOUGH, Jr., PLS
<br />949.685.0477
<br />Surveying Project Manager
<br />EXPERIENCE
<br />....................... ........... ............
<br />Mr, MoHwgh Ise licensed land surveyor with more than 35 years of experience. Kevin
<br />35 years
<br />manages NV5'ssurveying Operations In our Southern California Region. As survey manager,
<br />EDWATION
<br />he supervises all survoyingantl mapping oparatie is. This role Includes oversight of field
<br />AA Mathematics
<br />surveys, Construction staking, field crew supervision, field and aerial topographic surveys,
<br />the preparation and quality control of final maps, record of surveys, legal descriptions,
<br />LICENSES
<br />right
<br />of way mops, appraisal maps, boundary surveys and analysis, ALTA surveys, lot line
<br />Professional,Land Surveyor
<br />adjustments, constraint maps, condominium plans, and Corner records,
<br />i-CA#6910._ -
<br />i
<br />project Experience
<br />.......
<br />.....................................................................................
<br />SR-209, and SR-241- Eastern Transportation Corridor i Caltrans
<br />Kevin provided all boundary analysis and right-of-way CADD project coordination for
<br />i
<br />this 26�mre transportation corridor project in Orange County. His responsibilities
<br />Included supervision and approval and preparation of more than 500 legal
<br />descriptions and exhibits for right -of -Way acquisition He supervised preparation of all
<br />If
<br />appraisal maps, right-of-way maps records of surveys, survey control maps, horizontal -
<br />control calculations, and CADD-file management. Kevin served as the project manager
<br />1
<br />for right of way for this Challenging prcieot, which covered the full Spectrum of right-
<br />of -way mapping and engineering elements, tinder his direction, the right of way/
<br />mapping team evaluated title report restrictions and prepared project Constraint
<br />Maps; developed Property Binders containing all information and legal data used to
<br />for apprelsals and subsequent parcel acquisitions; prepared legal descriptions and
<br />exhibits for various types of property rights ocqulsition Including fee acquisitions,
<br />slope, drainage, roadway and utility easements, temporary construction easements,
<br />and Joint Use Agreements and Consent to Common Use Agreements for more than
<br />50-utility facilities.
<br />1-5/1-405 and Stake Parkway interchange i Caltrans
<br />As land surveyor -in -charge for this project, Kevin's duties covered densification of
<br />horizontal and vertical control, design surveys, aerial mapping, right-of-way base
<br />mapping and survey control maps for three miles of design Cross sections, His work on
<br />the project included preparation of legal description and plats for right-of-way takes,
<br />and preparation of appraisal maps and right-oll maps.
<br />Foothill Transportation Corridor- Ciao Segment i Caltrans
<br />Provided all boundary analysis and right of way GADD project coordination for the
<br />five mile sagment of the Foothill Transportation Corridor project, Responsibilities
<br />Included supervision and approval of preparation of more than 35 legal descriptions
<br />and exhibits for right of way acquisition as well as supervision of preparation of all
<br />appraisal (maps, right of way maps, records of surveys, survey control maps, horizontal
<br />control calculations, and CADD file management.
<br />Newhope Street Expansion i Caltrans
<br />Surveyor in charge responsible forcompletingthe boundary survey and analysis to
<br />5
<br />determine the existing street right of way, Caltrans right of way, and private ownership
<br />boundaries, as well as the preparation and oversight of all legal descriptions and
<br />exhibits required for the City of Fountain Valley to acquire the additional necessary
<br />haht of wav for the nminrt.
<br />
|