�1r :r
<br />March 20, 2018
<br />City of Santa Ana
<br />Public Works Department
<br />Attn: Armando Fernandez, Project Manager N V15
<br />20 Civic Center Plaza
<br />Santa Ana, CA9270d
<br />SUBJECT: Proposal for On -Gall 5ngineering Services, RFP No. 17.083 (Option A and B)
<br />bear Mr. Fernandez,
<br />At NV5, we acknowledge that design engineering projects are vital to the community, and we have moro.than to years of
<br />experience partnering with many clues and agencies somss Southorn California to provide on�sall services on projects of similar
<br />scope. We are excited to have the opportunity to provide these services to the City of Sante Ana (Chy), Wo have preparecithis
<br />Proposal to demonstrate hew our team is bestsulted to dellV.er tbo requestedservices and offerth6 following:
<br />Relevant Exparlenoo. At NV5we belleva that past experlence and s.uceass are a key indicator of future performance. We are
<br />committed to providing high-gUality.eervice and believe that ogmmltment Is one reason why aver 80Wa of our wodl oornes from
<br />repast clients —an obvious ilodloator of ollent satlsfaction. We have Included references, as requasted, es well as relevant
<br />project experience to demonstrate bur supeoss in fulfiilingsimilar.afforts and enoourage the Cityto cohtect our references to
<br />confirm our successful track record,
<br />Porsonnsk NVS offers the City a highly competent team with an unparalleled reputation and proven capability and expertise. We
<br />have chosen PraJeet Manager Charlie McKJploy, PE to lead the Water Resources (option A) projogts. Mr. McKinley has more
<br />than 30 years of axparienoe'In Water and "womwater design engineering for both large-scale capital improvement projects and
<br />small Infrastructure improvement projects, fie has a broad range of project experioncs with a "focus on pipelines, pumpstations,
<br />reservoirs, and treatment.
<br />Understanding both the project requirements and scope of work requested by the City, we have selected ProJec. t Manager David
<br />Niknafs, PE as your team leader for project under Aeneral Engineering other than Water Resources (Option R), Mr, Niknafs
<br />has both managed and directed shnhar projects throughout Southern California end has more than'SO years of civil design
<br />angineeringoxperlence with focus on street Improvements, Including rehabilitation, reconstruction, Intersection Widening arid
<br />Parkway Improvements. He is supported by a team of highly, educated engineers and designers as well on our carefully chosen
<br />subconsultants, most of which have been working with us for the past eight years. Should the need arise, our entire staff of
<br />dedicated professionals could be made available to be of service it) the Clty.
<br />Resources: We are equipped with the personnel and resources Mquired.to meet the City's schedule for any projects we
<br />undertake, and we have never missed a proiact deadline, We are financially viable, and there are no conditions that may
<br />Impede our ability to complete the City's projects, As a part of NV5, Ina., an international company with the local personality and
<br />presence to quickly and creatively address your engineering, design, and staff augmentation needs, we have the ability to assist
<br />our clients In an expanded role with aoowss to more, than 2,000 professionals from 100 focatlons. All services will be provided
<br />from our offices In Irvine, located less than 1s miles from the City,
<br />Quality and Cost Control: We have a proven work plan to complete projects an time, within budget, and with minimal impact to
<br />the surrounding businesses and residents. Our quality, cost, and schedule control measures will result In timely and successful
<br />completion of the City's projects. This successful track record provides the basis for our quick end reasonably priced project
<br />delivery.
<br />Amy Annhord, PE, Vice President of NV5 has the authority to contractually bind the team and may be contacted during the
<br />Proposal evaluation process,
<br />We lock forward to the opportunity to work with the City and help you achieve your goals and objectives. if you need further
<br />information, I may be reached by phone at (049) 685-04.77, or electronically at a1ny8miranl@nv5,com. Thankyou foryour time
<br />and consideration,
<br />Sincerely,
<br />NV5
<br />ry,--,, /,I,-_ ! CONTRACTAGREEMENT STATEMENT
<br />WIff 4m ow(
<br />6- f, NV6 concurs with all provisions as
<br />Amy Amirani, PC v contained In the sample agreement as
<br />David rof0s,PE Included In theRFP.
<br />1 rincipa6In-CYiarg®/ Vice President Director of Operations
<br />98901rvine Confer Drive I Irvine, CA 92818 I www.NVS.corn I Offioe; 949.585.0477 Fax: 949.685.0433
<br />
|