My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER, INC.
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:20:27 PM
Creation date
8/7/2018 12:56:56 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER, INC.
Contract #
A-2018-177
Agency
Public Works
Council Approval Date
7/17/2018
Expiration Date
7/17/2021
Insurance Exp Date
8/30/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />a Civic Center, StormwvoterLiftStotionRenovation Design Services <br />Orange County Groundwater Storage Program, Orange County, California. Orange County <br />Water District, Structural Engineer. Michael Baker provided engineering plans, specifications, <br />and estimates for the design of eight groundwater extraction wells. The wells ranged from 2,000 <br />to 4,500 gallons per minute and Included water-cooled variable -frequency drives, moveable <br />buildings, disinfection, and decorative buildings. <br />Whittier Pumping Plant No, 2 Replacement Projeot, Pico Rivera, California. City of Whittier. <br />Structural Engineer, Michael Baker provided design engineering services and construction <br />phase support, including full-time construction management and Inspection services, for the <br />replacement of Whittier Utility Authority's (WJA) Pumping Plant No. 2, which was originally <br />constructed in the 1930's, The new PP2 facility includes a new 18.9 -MGI) pump station, with <br />17,500 gpm of pumping capacity to enable WUA to pump during off-peak periods and reduce <br />power costs; two 2.2 -MG above -grade steel reservoirs to serve as the forebay and provide <br />operational storage; a 6,400 -square -foot pump building, including office space for water <br />production and pumping plant personnel; new piping and control valves at off-site reservoirs; <br />and upgraded SCADA and radio communication facilities throughout the entire WUA service <br />area. <br />Walnut Avenue Overcrossing Pumping Plant, Orange County, California. Caltrans. <br />Structural Engineer. Responsible for plans, specifications, and estimates (PS&E) per Caltrans <br />requirements, complete structural analysis, and design. Michael Baker provided design <br />services for a stormwater facility to discharge runoff from the Eastern Transportation Corridor <br />(ETC) located between the northbound ETC Frontage Road and Peter Canyon Channel, close <br />to the intersection between Jamboree Road and Walnut Avenue. <br />Steve Anderson Lift Station (formerly known as the Ellis Pump Station), Fountain Valley, <br />California. Structural Engineer responsible for the diversion structures for the 1-10A (66 -inch <br />Ellis Avenue trunk sewer) project and did the architectural and structural design for the 1-10B <br />(Steve Anderson Lift Station). The work involved design of a new pump station and diversion <br />structures. <br />Arroyo Simi Lift Station, Moorpark, California. Ventura County. Structural Engineer. Michael <br />Baker provided engineering design for the replacement of an undersized sewer lift station in a <br />high-growth area in the City of Moorpark. Michael Baker prepared the preliminary design report <br />to identify the conceptual design, key issues, and design parameters for the new lift station. <br />Michael Baker designed the new 11.8 -million -gallon -per -day lift station to meet current and <br />future sewer flows in a rapidly expanding residential area. Additionally, the pump selection <br />accounted for a future parallel force sewer main. Michael Baker prepared electrical plans, <br />specifications, and cost estimates for the 35 -foot -deep lift station, which included a motor control <br />center, new piping, surge tank, lighting, emergency backup power generator, and other site <br />improvements. Additional construction management services included providing shop drawing <br />review and responses to contractor requests for information. <br />NTENNAT1QNAL Sal Sheikh, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.