My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC (2)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:45:26 AM
Creation date
8/9/2018 1:35:13 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC
Contract #
A-2018-172
Agency
PUBLIC WORKS
Council Approval Date
7/3/2018
Expiration Date
7/2/2021
Insurance Exp Date
10/1/2019
Destruction Year
0
Document Relationships
STANTEC (3)
(Amended By)
Path:
\Contracts / Agreements\S
STANTEC (4)
(Amended By)
Path:
\Contracts / Agreements\S
STANTEC (5)
(Amended By)
Path:
\Contracts / Agreements\S
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Relevant Project Experience <br />The following pages provide descriptions of key projects completed for public agencies in California <br />within the past five years. Presented thereafter is a table that present a selection of similar experience <br />with rate studies and revenue programs for clients in California and throughout the county. <br />Dates of Service: 2015 — Present <br />Project Team: Mark Hildebrand, Matt <br />Freiberg, Ben Stewart <br />Client Contact: Joone Lopez, General <br />Manager; jlopez@mnwd.com; (949) <br />448-4071; 27500 La Paz Rd. Laguna <br />Niguel, CA 9257 <br />Comprehensive Water, Sewer and Recycled Water Rate Study <br />The Moulton Niguel Water District is a retail water, wastewater and recycled water purveyor located in <br />Orange County, CA. The district indirectly purchases wholesale water that originates from Colorado <br />River California Aqueduct. In 2014, the state of California issued drought state of emergency <br />declarations in response to record -low water levels In California's rivers and reservoirs, thereby <br />impacting the cost of imported water and the availability of water supplies. <br />Our team worked with the district to develop budget based water rates, recycled water rates, and <br />wastewater rates that would enable the district to (1) recover projected operating cost increases; (2) <br />continue to repair and replace the district's aging infrastructure; (3) maintain the financial stability of the <br />utilities; (4) avoid the depletion of reserves; and (5) comply with regulatory and legal requirements. <br />Moulton Niguel's water rates are budget -based rates. Residential customers are given an indoor and an <br />outdoor water budget for the first two tiers, respectively, and then three additional tiers which are used <br />to fund the conservation program and peaking costs. Commercial customers' water budgets are <br />calculated based on a three-year rolling average of monthly water use. Irrigation and recycled water <br />customers' water budgets are calculated In the same manners as residential outdoor water budgets. <br />Stantec calculated a monthly fire protection charge for properties with private fire suppression systems. <br />In response to the drought, Stantec helped the district shape water shortage rates that complement the <br />district's water shortage contingency plan, which adjusts customers' assigned water budgets during <br />specified stages. During Stages 2-5, any customer who uses water in excess of their calculated water <br />budget is required to pay a unit -based administrative penalty in addition to the standard volumetric <br />charge. The wastewater rates were structured to recover the costs to operate and maintain the <br />wastewater collection system and to pay wholesale costs for treating and disposing of its wastewater. <br />City of Santa Ana, Cailfornia I water and Sewer Enterprise Cost of Service Study Stantec 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.