Laserfiche WebLink
Local Assistance Procedures Manual EXHI131T 10-H1 <br />Cost Proposal <br />EXHIBIT 10-112 COST PROPOSAL Page 3 of 3 <br />Certificatimr of Direct Costs; <br />1, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost <br />proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the <br />contract terms and the following requirements: <br />7. Generally Accepted Accounting Principles (GAAP) <br />8. Terns and conditions of the contract <br />9. Title 23 United States Code Section 112 - Letting of Contracts <br />10. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures <br />11, 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of <br />Engineering and Design Related Service <br />12. 48 Code of Federal Regulations Par? 9904 Cost Accounting Standards Board (when applicable) <br />All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be <br />retained in the project files and be in compliance with applicable federal and state requirements. Costs that are <br />noncompliant with the federal and state requirements are not eligible for reimbursement. <br />Prime Consultant or Subeons Rant Certifying: <br />Name: Ivan Liovin Title *: President <br />Signature ; 2— 03/15/2018 <br />gn Date of Certification (mm/dd/yyyy): <br />Email; ivan@,abcdrilling.com Phone Number: 562-981-8575 <br />Address; 1150 E Burnett Street, Signal Hill, CA 90755 <br />* An individual executive or financial officer of the consultant's or subconsultant's organization at a level <br />no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent <br />the financial information utilized to establish the cost proposal for the contract. <br />services <br />Services Include, but not Limited to: <br />environmental and geotechnical drilling, soil, soil gas, groundwater sampling, well installations, <br />development and abandonments, geotechnical instrument installations, utility locating, <br />potholing, air knife, saw cutting, concrete coring, limited access drilling, mud rotary/ air rotary, <br />easing hammer, hollow stein auger, direct push, and wireline coring. <br />Page 7 of 9 <br />./anunry 2015 <br />25F-174 <br />