|
Anthony I Lizzi
<br />Contract Manager
<br />at 56 various City parks for presence of lead in soil. Mr. Lizzi Is responsible for client interaction, and has extensive technical and
<br />practical experience in all aspects of assessing surface and subsurface geology, geochemistry, and contamination of soil, soil
<br />vapor, and groundwater.
<br />Los Angeles Department of Water and Power (LADWP), On -Cali Environmental Consulting Services Contract Los An.
<br />gelds, California: Princlpal Geologist for environmental projects such as Phase I and Phase II ESAs for this on-call contract at
<br />various sites throughout the LADWP footprint. Reviewed Phase I ESA reports on numerous sites in Southern California ranging
<br />from vacant, undeveloped land to industrial properties. Managed the Phase II ESA field activities at numerous LADWP sites for
<br />soil, soil gas, and groundwater investigations. Performed senior review of technical documents.
<br />City of Colton, Guyaux Landfill, Phase it Work Plan, Colton, California: Principal Geologist managed the preparation of a
<br />Phase I ESA, Phase 11 Work Plan and Phase II ESA implementation at a waste disposal site (WDS) measuring 4 acres to charac-
<br />terize and delineate the lateral and vertical extent of the wastes, including additional Investigation of previously Identified °hot spot°
<br />areas of 'soil' containing elevated lead concentrations. The work plan and the results of the Phase If ESA will be used to assist
<br />with evaluating whether the WDS can be capped/covered so the City can construct a 29 -acre soccer complex and community
<br />park.
<br />Port of Long Beach, On -Call Environmental Consulting Services Contract: Under the new, three -year -term contract, Mr.
<br />Llzzl Is the Principal Geologist for the environmental services being performed in the areas of, but not limited to, Identification of
<br />hazardous materials used in the construction of buildings and appurtenance, including, but not limited to, asbestos containing
<br />materials, PCBs, and lead-based paint, or stored within or outside of any facilities; physical and chemical sampling and analyses
<br />for detection and delineation of surface and subsurface contamination of soil and groundwater; and small scale removal and/or
<br />abatement of asbestos containing materials and lead-based paint from structures scheduled for demolition or renovation.
<br />Anaheim Union High School District, Proposed School, Anaheim, California: Technical Advisor for a PFA of the West
<br />Lincoln Avenue properties site along West Lincoln Avenue and North Ohio Street in Anaheim, California. The school district is
<br />considering obtaining the site, which Is adjacent to the Anaheim High School. In general, land use in the vicinity of the site is
<br />primarily commercial and residential, and records Indicated several of the current structures present since at least 1927. Ninyo &
<br />Moore's Phase I ESA identified some potential historical environmental issues including: former gasoline stations; and potential
<br />lead based paint and organochlorine pesticides. Ninyo & Moore designed sampling and analyses for these Issues In a PEA work
<br />plan approved by the Department of Toxic Substances Control (DTSC) and performed the PFA During the PEA, Ninyo & Moore
<br />conducted the soil and soil gas sampling in accordance with the PEA work plan, which followed the most current DTSC guidance
<br />documents. The field work included collecting over 400 X -Ray florescence (XRF) readings and soil sampling results surrounding
<br />the historic site buildings. The results of the PFA have been presented to, and approved by, the DTSC. The PEA includes a health
<br />risk screening evaluation of COPCs detected in the shallow soil. We are assisting the school district with obtaining the School
<br />Cleanup Agreement with the DTSC which will proceed with the preparation of the Removal Action Work plan.
<br />California Department of General Services, Phase II Subsurface Investigation, Hollywood, California. Project manager for
<br />a Phase II subsurface Investigation at a downtown parcel to assess recognized environmental conditions, Managing development
<br />of a field sampling and analysis program to evaluate the nature of any hazardous materials or substances that may be present in
<br />soil, soil gas, and groundwater at the subject site.
<br />Anthony J. Llai, PG, CHG, Contract Abnaper I Mnyo&Moore I Geotechnical& EMonmentel Seances Consultants
<br />25F-223
<br />
|