Laserfiche WebLink
Nancy .Anglin <br />Quality Assurance Officer <br />City of Laguna Beach, Water Tank Ravine Burrc•Site Remediation, Laguna Beach, California: Served as Quality Assur- <br />ance Officer for our environmental consulting services to the City in support of the remedlation and restoration of primaryand <br />secondary.burn sites situated in a ravine that is located in a designated open space area, Previous waste characterization <br />was deficient and a supplemental assessment was conducted that successfully characterized and delineated bum ad wastes. A <br />Remedial Action Plan (RAP) was prepared that recommended the following: clean closure based on the City's desire to discon- <br />tinue monitoring the burn site; requirements to remove the temporary shotcrete/energy dissipater constructed to reduce move- <br />ment of wastes downstream within the drainage channel; site conditions consisting of steep slopes with the thickest' wastes <br />located within the drainage channel making it difficult to maintain an adequate cap/cover, and the ideation a cid size of the but <br />site. The RAP Included a Waste Management Plan, Field Sampling and Analysis Plan, Quality AssurancelQuallty.Control Plan, <br />and Site Health and Community Health and Safety Plan, Provided consulting and coordination services to other City contrac, <br />tors that Involved preparing remedial action specifications, construction analysis and restoration plans for removing wastes, <br />and confirming wastes had been adequately removed. Community outreach was particularly important, due, to the proximity of <br />a school site and adjacent residences, Required permits were obtained, and then evaluated and acquired pre -approval let- <br />ters for.disposal of various waste streams to appropriate waste"disposal facilities based on in-situ testing of the wastes during <br />previous assessments. Under the direction of Ninyo & Moore, the waste removal action was performed and .Clean Closure <br />was granted to the City by'the Regional Water Quality Control Board (RWQCB) and the Local Enforcement Agency (LEA). <br />AUHSO, Proposed School, Anaheim, Callfomla:,Provided quality assurance and document review for a Phase I Environ- <br />mental Site Assessment (ESA) and Preliminary Endangerment'Assessment (PEA) of the West Lincoln Avenue Properties. along <br />West Lincoln Avenue and North Ohio Street in Anaheim, Calffomia, The school district was considering obtaining the site, which <br />is adjacent to the Anaheim High School. In general,'land use in the vicinity of the site Is primarily commarcial and residential, <br />and records Indicated several of the current structures present since at least 1927. The Phase I ESA identified some potential <br />historical environmental issues, Including former gasoline stations and potential lead based paint and organochlorine pesticides <br />(OCPs), which Ninyo & Moore designed a sampling and analyses plan for during the PEA. The plan was approved by the <br />Department of Toxic Substances Control (DTSC). The ;PEA was performed and included a health risk screening evaluation <br />of chemicals of potential concern (COPCs) detected in the shallow soil. We also assisted the school district with obtaining the <br />School Cleanup Agreement with the DiSC, and will proceed with the preparation of the Removal Action Work Plan (RAW). <br />City of Temple City, Various Projects, Temple City, California: Acted as Quality Assurance Officer supporting appro- <br />priate staffing and deliverable reviews for project activities whloh included hazardous building material, surveys for up- <br />coming demolition of a previous mortuary and four apartment buildings as the city was planning to purchase these proper- <br />ties. Asbestos and lead surveys were performed, Including developing an inventory of universal waste materials. Abatement <br />bidding specifications were prepared for,the "mortuary; including supporting the City with a pre-bid job walk for abate- <br />ment and demolition contractors. Abatement monitoring services were performed for the mortuary, "including close= <br />out report documentation. Abatement monitoring services for the four apartment.bulidings is planned for Summer, 2018. <br />City of Los Angeles Bureau of Engineoring, Multiple On -C611 Geotechnical and Environmental Engineering Services <br />Contracts, Los Angeles, California: Ms. Anglin serves 'as ,the Quality Assurance Officer for both the environmental <br />services portions of these 'on-call agreements with the Bureau of Engineering. 'Under the environmental portion of these <br />contracts, Ninyo & Moore mainly provides'Phasef ESAs,'Pliase II ESAs, methane surveys, groundwater monitoring <br />and sampling, remediation feasibility studies, and remedial action planning, In her role as Quality Assurance Officer, <br />Ms._ Anglin ensures the tasks are staffed with appropriately licensed and experienced personnel, appropriate testing is, <br />performed by Slate Certified laboratories, and ensures deliverables are reviewed by the Professional -In Charge of the work. <br />Nancy Anglin, aEM, Quality Assurance Officer I MnyoB_Moore I Geatechnicel&Ewonmenlel SciencesConsoltents 2 <br />25F-225 <br />