My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT HAZARDOUS MATERIALS SURVEYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25F - AGMT HAZARDOUS MATERIALS SURVEYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 7:29:46 PM
Creation date
8/16/2018 7:20:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25F
Date
8/21/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />FY177T4TT tn_A•F s^nc•r nnnnnn sr <br />EXHIBIT 10-H <br />Cost Proposal <br />A2 - Hazardous Materials Services <br />August 2018 <br />25F-240 <br />ays rnvavyr� <br />Effective Dates: Se tember 2018 throe h Au iust 2021 <br />charge <br />Aquifer Testing <br />OTHER DIRECT <br />Price/Unit <br />Charge <br />Groundwater Monitoring <br />Price Unit <br />Gmndfas RedMow2- Pump w controller <br />$ <br />110 day <br />lGratmulwater Equipment <br />$ <br />355 day <br />3.30 gem Digital naw Meter/Tatalizer <br />$ <br />230 day <br />Sollnst 350' Dec Water level Meter <br />$ <br />90 day <br />Leval Logger(water column) <br />$ <br />7D daV <br />DU/Watarintenc�e Probe <br />$ <br />75 day <br />Premum Transducer <br />s <br />65 day <br />low Flow Pump <br />$ <br />60 day <br />Levelrmll Trans/data loggers <br />$ <br />260 week <br />jccntmnmrMF5O <br />Is <br />115 day <br />Barometric Date Logger <br />Drilling/Exeavatlon/Soil Sampling <br />$ <br />105 week <br />Marine Battery <br />1/4'X1/4"bonded tubing <br />$ <br />$ <br />Ig day <br />0.60 foot <br />rchased Fleld Cansumsbles <br />$ <br />100 day <br />pH/[ond/remp Mater <br />$ <br />25 day <br />re Sample (EPA Method 5035) <br />32 pertest <br />Turbldny Meter <br />$ <br />30 day <br />ick Syringa Samples (EPA Method 5035) <br />$ <br />ie paftest <br />Repld Real Manual Balling Winch <br />$ <br />115 tlay <br />G plea and cable locator <br />$ <br />29 day <br />WC 1.3(B"Boller <br />$ <br />18 day <br />UsaHe <br />$ <br />340 day <br />OIs, WaterSamDla Ballon Weighted l.6" <br />$ <br />fi each <br />Usage <br />i�aa <br />$ <br />420 weak <br />Duposahle VOC BaIIer Tlps (1.6") <br />$ <br />1.50 each <br />Usage <br />$ <br />1,260 month <br />fNsposable 0.45 Micron Fliter <br />$ <br />3a each <br />Usage <br />$ <br />140 day <br />Nybn String <br />$ <br />0 roll <br />Usage <br />$ <br />{2D Weok <br />Dmm Dogy <br />$ <br />18 day <br />Usago <br />$ <br />1,360 momh <br />OOT I7H SSgel Water Drams <br />$ <br />75 each <br />Meter Usage <br />$ <br />140 day <br />3/8°play Tubing <br />$ <br />0.50 tops <br />4Gas Meter Usage <br />$ <br />420 week <br />Peristaltic Pump/Micropurge Pump <br />$ <br />30 day <br />4Gas Meter Usage <br />$ <br />1,260 month <br />Polyethylene check valves <br />$ <br />15 each <br />Weatherstetlon <br />$ <br />75 day <br />Hazardous Building Material Survey <br />Weathar5tatlon <br />$ <br />225 week <br />HBMs samprng Equipment <br />$ <br />25 day <br />Weather Station <br />$ <br />675 month <br />Alr Sampling Eq element <br />$ <br />50 day <br />Dust Monitor(personal hand held) <br />$ <br />100 day <br />XRF Analyzer Usage <br />$ <br />300 day <br />Dust Manitor(Personal hand held) <br />$ <br />300 week <br />XAF Analyzer Usage <br />$ <br />1,200 week <br />Dust Monitor (personal hand held) <br />$ <br />900 month <br />XRF Analyeer Usage <br />$ <br />3,600 month <br />GPS Unit <br />$ <br />ISO day <br />Delmhurst Moisture Meter <br />$ <br />35 day <br />GPSL <br />$ <br />750 week <br />Level C Personal Protective Equipment <br />$ <br />25 personday <br />GPS Unit <br />$ <br />2,250 month <br />Level D Personal Protective Equipment <br />$ <br />10 person -day <br />Vapor Extraction Testing <br />Manual Soil Vapor Survey <br />Vapor Box <br />$ <br />30 day <br />lads Hammer(Rotahammer) <br />$ <br />60 day <br />edlar Bags <br />$ <br />28 each <br />NNaflawtubing 0.19'ID 114 OD <br />$ <br />050 feat <br />summa Regulator <br />$ <br />75 eads <br />Disposahle Trp <br />$ <br />15 each <br />Summa Canister <br />$ <br />125 each <br />NOTE: <br />Otherequlpmesdandsupses, andsubcontractedservlces uAcluding' analyticol laboratory sc wcn)WIN be!molredat rost due ION <br />A2 - Hazardous Materials Services <br />August 2018 <br />25F-240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.