Laserfiche WebLink
s) The Contractor shall comply with safety requirements and practices as outlined in <br />accordance with Agency requirements and California Occupational Health and Safety <br />Administration (Cal/OSHA). <br />t) The Contractor shall do all that is necessary to maintain a safe working environment for <br />Contractor's employees, Agency and facility employees and the general public present. <br />u) The Contractor shall work with the Agency facility staff to understand and abide by any <br />site-specific security procedures. <br />v) The Contractor shall clean up any construction dust, dirt and debris from work surfaces or <br />equipment after work is completed each day and prior to occupancy. <br />w) The Contractor shall be very careful to leave the facility with no damage to its structure, <br />contents, existing finishes, and with no evidence of cutting or patching, and with all fixtures <br />and lenses cleaned. <br />x) The Contractor is responsible for securing all necessary permits, including Title 24 energy <br />code documentation and compliance permit, and shall abide by local laws and regulations. <br />y) Prior to ordering of equipment and fixtures, Contractor is to verify fixture quantities, types <br />and installation needs, including specifying equipment that complies with existing electrical <br />service. Final project invoice price will be based upon the quantity of each fixture type <br />installed multiplied by the unit price for that fixture. <br />16 of 41 <br />25C-46 <br />